My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LEGO CONSTRUCTION
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(24-07-01) Construction of Intracoastal Sports Park
>
LEGO CONSTRUCTION CO
>
LEGO CONSTRUCTION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2024 11:27:33 AM
Creation date
9/11/2024 11:24:23 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFP ITB # 24-07-01 - INTRACOASTAL SPORTS COURT COMPLEX <br />CITY OF SUNNY ISLES BEACH 19 <br />Fire Stations 81, 67 & 55 <br />City of Weston <br />Past Experience- Project #6 <br />Interior demolition and renovation of 3 fire stations: FS81, <br />FS67, FS55. Scope of work includes the replacement <br />of AC units, ducts, fire alarm systems, plumbing <br />and sanitary lines, new fixtures, toilet partitions and <br />accessories, bathroom renovation to comply with ADA, <br />new electrical installations, lights, sensors, emergency <br />lights, fire sprinkler system, flooring, concrete columns, <br />CMU walls, stucco, paint, acoustical ceiling, kitchen <br />equipment and cabinets and apparatus bay epoxy <br />flooring, roll up door, wood and metal doors, new <br />backflow preventer, water main tapping, roof addition, <br />parking striping, landscaping restoration. <br />Project Status: Completed on time <br />Delivery Type: Design Bid-Build <br />Contract Role: Prime Contractor <br />Project Size: 23,987 SF <br />Project Cost: $2,826,620.73 <br />Project Commencement: 12/1/2017 <br />Project Completion: 9/5/2019 <br />Key Relevancy <br />• Demolition <br />• HVAC Upgrade <br />• MEP Upgrades <br />• ADA Bathroom <br />• Kitchen & Dining Area Renovation <br />• Parking & Site Modification <br />• Phase Approach <br />• Renovation Project <br />• Active & Occupied Facility <br />Owner’s Projects <br />Representative <br />POC Name: Alex Wood, Project Manager <br />P: (954) 385 2000 <br />E: awood@westonfl.org <br />Key Personnel ( Assigned to this Project ) <br />Miguel Guerrero <br />Pre Construction <br />Manager <br />Yadier Zarabozo <br />Superintendent <br />Mariela Lobo <br />Project Manager <br />Luis Garcia <br />Project Executive <br />Municipality
The URL can be used to link to this page
Your browser does not support the video tag.