My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
West Construction
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(24-07-01) Construction of Intracoastal Sports Park
>
WEST CONSTRUCTION
>
West Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2024 1:12:42 PM
Creation date
9/11/2024 1:09:05 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
#Activity ID Activity Name Original Duration Start Finish Total Float <br />1 Intracoastal Sports Park (Sunny Isles Beach) - Bid ScheduleIntracoastal Sports Park (Sunny Isles Beach) - Bid Schedule 205d 01-Oct-24 27-May-25 0d <br />2 Contract Dates (In Calendar Days)Contract Dates (In Calendar Days)205d 01-Oct-24 27-May-25 0d <br />3 001 NTP 0d 01-Oct-24*0d <br />4 002 CONTRACT TIME TO SUBSTANTIAL (CALENDAR DAYS)179d 01-Oct-24 28-Mar-25 0d <br />5 003 CONTRACT TIME TO FINAL COMPLETION (CALENDAR DAYS)239d 01-Oct-24 27-May-25 0d <br />6 004 SUBSTANTIAL COMPLETION 0d 28-Mar-25 0d <br />7 005 FINAL COMPLETION 0d 27-May-25 0d <br />8 Construction - (In Standard 5- Day Work Days)Construction - (In Standard 5- Day Work Days)124d 01-Oct-24 21-Mar-25 47d <br />9 Staging PlanStaging Plan 15d 01-Oct-24 21-Oct-24 0d <br />10 006 UTILITY LOCATES 2d 01-Oct-24 02-Oct-24 0d <br />11 007 SURVEY-BOUNDARY LAYOUT 3d 03-Oct-24 07-Oct-24 0d <br />12 008 MOBILIZATION-STAGING & TEMP UTILITIES 5d 03-Oct-24 09-Oct-24 0d <br />13 009 TEMP FENCE & SCREEN 3d 08-Oct-24 10-Oct-24 0d <br />14 010 SILT FENCE & CATCH BASIN PROTECTION 3d 11-Oct-24 15-Oct-24 0d <br />15 011 WASH OUT AREA 1d 16-Oct-24 16-Oct-24 0d <br />16 012 TREE/LIGHT POLE PROTECTION 2d 17-Oct-24 18-Oct-24 0d <br />17 013 MOT SETUP 1d 21-Oct-24 21-Oct-24 0d <br />18 DemolitionDemolition 10d 21-Oct-24 01-Nov-24 0d <br />19 014 TREE REMOVALS AND RELOCATIONS 5d 21-Oct-24 25-Oct-24 0d <br />20 015 REMOVE & RELOCATE EXISTING SITE FURNISHINGS & EQUIPMENT 3d 28-Oct-24 30-Oct-24 0d <br />21 016 DEMOLITION OF EXISTING STRUTCURES 2d 29-Oct-24 30-Oct-24 0d <br />22 017 REMOVE EXISTING ASPHALT & CONCRETE PAVEMENT 2d 31-Oct-24 01-Nov-24 0d <br />23 Site PreparationSite Preparation 12d 04-Nov-24 19-Nov-24 57d <br />24 018 CLEAR & GRUB 5d 04-Nov-24 08-Nov-24 0d <br />25 019 REMOVE/FILL ROUGH GRADE FIELD AREA 5d 04-Nov-24 08-Nov-24 0d <br />26 020 SITE UTILITIES - DRAINAGE/SEWER/WATER 5d 11-Nov-24 15-Nov-24 0d <br />27 021 BACKFILL 3d 13-Nov-24 15-Nov-24 0d <br />28 022 ELECTRICAL UNDERGROUND/SITE POWER 5d 13-Nov-24 19-Nov-24 57d <br />29 023 IRRIGATION ROUGHS 2d 18-Nov-24 19-Nov-24 57d <br />30 BuildingBuilding 90d 18-Nov-24 21-Mar-25 47d <br />31 SHELLSHELL 74d 18-Nov-24 27-Feb-25 16d <br />32 FOUNDATIONFOUNDATION 23d 18-Nov-24 18-Dec-24 0d <br />33 024 GRADE & COMPACT AREA FOR CONSTRUCTION & TEST 2d 18-Nov-24 19-Nov-24 0d <br />34 025 DIG FOR FOOTERS 1d 20-Nov-24 20-Nov-24 0d <br />35 026 COMPACT FOOTER AREA 1d 21-Nov-24 21-Nov-24 0d <br />36 027 FOOTERS - FORM & PLACE REBAR 2d 22-Nov-24 25-Nov-24 0d <br />37 028 FOOTERS - POUR IN PLACE 2d 26-Nov-24 27-Nov-24 0d <br />38 029 STEM WALL 5d 28-Nov-24 04-Dec-24 0d <br />39 030 UNDER SLAB UTILITIES - ELECTRICAL & PLUMBING 3d 05-Dec-24 09-Dec-24 0d <br />40 031 TERMITE SPRAY 1d 10-Dec-24 10-Dec-24 0d <br />41 032 VAPOR BARRIER 1d 10-Dec-24 10-Dec-24 0d <br />42 033 SLAB - FORM & PLACE REBAR 3d 11-Dec-24 13-Dec-24 0d <br />43 034 SLAB - POUR IN PLACE 2d 16-Dec-24 17-Dec-24 0d <br />44 035 SAWCUT AS NEEDED 1d 18-Dec-24 18-Dec-24 0d <br />45 036 SEAL CONCRETE & JOINTS AS NEEDED 1d 18-Dec-24 18-Dec-24 0d <br />46 MASONRY/EXT. FRAMINGMASONRY/EXT. FRAMING 8d 19-Dec-24 30-Dec-24 0d <br />47 037 1ST LIFT - BLOCK 5d 19-Dec-24 25-Dec-24 0d <br />48 038 INSTALL BLOCK CUTOUTS FOR UTILITIES 1d 26-Dec-24 26-Dec-24 0d <br />Q4 Q1 Q2 Q3 <br />2025 <br />27-May-25, Intracoastal Sports Park (Sunny Isles Beach) - Bid Schedule <br />27-May-25, Contract Dates (In Calendar Days) <br />NTP, 01-Oct-24* <br />CONTRACT TIME TO SUBSTANTIAL (CALENDAR DAYS) <br />CONTRACT TIME TO FINAL COMPLETION (CALENDAR DAYS) <br />SUBSTANTIAL COMPLETION, <br />FINAL COMPLETION, <br />21-Mar-25, Construction - (In Standard 5- Day Work Days) <br />21-Oct-24, Staging Plan <br />UTILITY LOCATES <br />SURVEY-BOUNDARY LAYOUT <br />MOBILIZATION-STAGING & TEMP UTILITIES <br />TEMP FENCE & SCREEN <br />SILT FENCE & CATCH BASIN PROTECTION <br />WASH OUT AREA <br />TREE/LIGHT POLE PROTECTION <br />MOT SETUP <br />01-Nov-24, Demolition <br />TREE REMOVALS AND RELOCATIONS <br />REMOVE & RELOCATE EXISTING SITE FURNISHINGS & EQUIPMENT <br />DEMOLITION OF EXISTING STRUTCURES <br />REMOVE EXISTING ASPHALT & CONCRETE PAVEMENT <br />19-Nov-24, Site Preparation <br />CLEAR & GRUB <br />REMOVE/FILL ROUGH GRADE FIELD AREA <br />SITE UTILITIES - DRAINAGE/SEWER/WATER <br />BACKFILL <br />ELECTRICAL UNDERGROUND/SITE POWER <br />IRRIGATION ROUGHS <br />21-Mar-25, Building <br />27-Feb-25, SHELL <br />18-Dec-24, FOUNDATION <br />GRADE & COMPACT AREA FOR CONSTRUCTION & TEST <br />DIG FOR FOOTERS <br />COMPACT FOOTER AREA <br />FOOTERS - FORM & PLACE REBAR <br />FOOTERS - POUR IN PLACE <br />STEM WALL <br />UNDER SLAB UTILITIES - ELECTRICAL & PLUMBING <br />TERMITE SPRAY <br />VAPOR BARRIER <br />SLAB - FORM & PLACE REBAR <br />SLAB - POUR IN PLACE <br />SAWCUT AS NEEDED <br />SEAL CONCRETE & JOINTS AS NEEDED <br />30-Dec-24, MASONRY/EXT. FRAMING <br />1ST LIFT - BLOCK <br />INSTALL BLOCK CUTOUTS FOR UTILITIES <br />Intracoastal Sports Park (Sunny Isles Beach) - Bid Schedule 04-Sep-24 1 of 3 <br />Actual Level of Effort <br />Actual Work <br />Remaining Work <br />Critical Remaining Work <br />Milestone <br />summary <br />Intracoastal Sports Park (Sunny Isles Beach) - Bid Schedule <br /> <br />West Construction, Inc <br />ALL CONSTRUCTION DURATIONS ARE IN WORK DAYS UNLESS OTHERWISE NOTED <br /> <br />Data Date: 01-Oct-24 <br /> <br />Final Completion Date: 27-May-25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.