Laserfiche WebLink
A7 . Connect to new 12" PVC RWL shown on sheet CP-101 near western most building wall. <br />Revised plans will indicate this. <br />Q8. Roof drain and overflow plans do not describe the route, only show to walls, and I did not <br />find any detail where it connected. <br />AS. Connect to new 12" PVC RWL shown on sheet CP-101 near western most building wall. <br />Revised plans will indicate this. <br />Q9. Per Doc Invitation to BID: "is requesting bids from qualified Contractors ("Bidders," <br />"Proposers," "Contractors") to construct two lighted tennis courts, an operations building and <br />community park with walking paths". Please confirm if we need to provide you with price for <br />new Lighting kit for ANCHORs at Arch area 101-covered terrace if so, please provide cut sheets <br />or spec for those Lighting Kits on A2.0l. <br />A9 . Please refer to revised sheet E-001-Electrical Symbols and Legends with revised <br />specifications for the lights on the building. <br />QlO. No Specs for Lighting types F2 and F3 at asphalt parking and walking path on ElOl, please <br />provide. <br />Al0. A new sheet E-001-Eelctrical Symbols, Specifications, Fixture Schedules has been added <br />which show the specification for the site lighting. <br />Ql0. Roof drain and overflow plans do not describe the route, only show to walls, and I did not <br />find any detail where it connected. <br />Al0. Connect to new 12" PVC RWL shown on sheet CP-101 near western most building wall. <br />Revised plans will indicate this. <br />Qll. At the pre-bid, the City stated that the contract will be awarded as Lump Sum. In <br />that case, can the detailed bid sheet be eliminated? <br />All. No, the line itemized bid sheet will not be eliminated and must be completely filled-out <br />to be determined a responsive bidder. Per page 34 of the 1TB, bidder must completely fill out <br />each column below, i.e., unit price and total. <br />Q12. As it relates to question 1, we find discrepancies between bid sheet quantities and take- <br />off quantities. If we bid the bid sheet quantities and the actual installed quantities are different, <br />how will the adds/deducts be handled? <br />A12. Refer to updated quantities on the bid sheet. If you find any discrepancies, please <br />include them in your bid under EXCEPTIONS. <br />Q13. Please explain what bid sheet item #22 includes. Is it the engineer's calculated net <br />amount of all cut and fill, import and export required for the site, including the building, court <br />and park open areas; essentially all the grading. <br />A13 . Correct, item #22 includes all site exaction to achieve finish grade elevations. <br />Q14. Pipe sizes on plans are in conflict with pipe sizes on the bid sheet. Please clarify. <br />2