My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
West Construction
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(24-07-01) Construction of Intracoastal Sports Park
>
WEST CONSTRUCTION
>
West Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2024 1:12:42 PM
Creation date
9/11/2024 1:09:05 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A14. Bid sheet has been updated to reflect pipe quantities on latest plans. <br />QlS. Assuming that the retaining wall is to be included (noted as "by others" on civil plan), <br />where is it to be entered on the bid sheet? <br />AlS. Bid sheet has been updated to include a line item for the retaining wall. Bidder must use <br />Addendum# 3 Price Sheet. <br />Q16. Please provide engineering for the retaining wall. <br />A16 . The detail of the retaining wall is on sheet LH-501. Contractor to provide signed and <br />sealed shop drawings from a structural engineer for the retaining wall. <br />Q17. Proposed drainage exfiltration areas are very deep and encroach a muck layer. Muck <br />tends to be unstable below the ground water level. If the exfiltration scope of work expands in <br />the process of removing the muck from the path of the drainage, how will that be <br />compensated? <br />A17. Exfiltration trenches have been designed to meet Miami-Dade -RER DERM requirements. <br />Contractor shall install exfiltration trenches per designed plans. <br />Q18 . The doc's mention alternates to be approved by the Architect/Engineer of record. <br />Does that mean pre-bid or post award? <br />A18. Post award. <br />Q19. Please confirm that the sports court IS IN contract and NOT by others. <br />A19. The sports court is in the contract and included in item #35-39. <br />Q20. Please confirm that exercise areas are by others, NOT in contract. <br />A20. Contractor is responsible for rough grading and base prep of the area. The exercise <br />equipment will be installed by the City. <br />Q21. Please confirm that the seawall is by others, NOT in contract. <br />A21. Correct, the seawall will be installed by others. Not included in this contract. <br />Q22 . Plea se confirm that all permits will be paid for by allowance. <br />A22. Permits will be paid by the City . <br />Q23. Who supplies the irrigation meter? <br />A23 . Contractor to coordinate with City of North Miami Beach for new meter installation. <br />Q24. See Detail 1 of S-2.00, note #2 : what does the word TEMP . mean? <br />A24. "TEMPERATURE" <br />Q25. See Demo plan: confirm that the curb running parallel and adjacent to the guardrail will <br />be removed along with the guardrail. <br />A25. The curb will need to be removed that runs along the guardrail. <br />Q26. What is the inverted L shaped hashed area on the SE corner of the demo plan? <br />3 <br />/
The URL can be used to link to this page
Your browser does not support the video tag.