My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment C - Biddding Specification 1-23-25
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Attachment C - Biddding Specification 1-23-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:22:18 AM
Creation date
2/20/2025 9:18:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 028200 Asbestos Abatement-1 <br />SECTION 028200 <br />ASBESTOS ABATEMENT <br />PART 1 - GENERAL <br /> <br />1.1 SUMMARY <br /> <br />A. Related Documents: <br /> <br />1. Drawings and general provisions of the Subcontract apply to this Section. <br /> <br />2. Review these documents for coordination with additional requirements and <br />information that apply to work under this Section. <br /> <br />B. Section Includes: <br /> <br />1. Removal, repair, encapsulation, enclosure and other abatement of asbestos- <br />containing materials as specified herin and shown on drawings. <br /> <br />2. Compliance with all applicable Federal, State, and local regulations pertaining to <br />work practices. <br /> <br />3. Protection of workers, visitors to the site, and persons occupying areas adjacent <br />to the site. <br /> <br />4. Provide medical examinations and maintain medical records of personnel as <br />required by the applicable Federal, State, and local regulations. <br /> <br />5. The scope of this work does not include the manifesting, transporting, or <br />disposal of hazardous waste. The University will manifest, transport, and dispose <br />of hazardous waste that has been properly packaged, labeled, and stored by the <br />subcontractor. <br /> <br />6. The University’s review and approval of the asbestos abatement subcontractor’s <br />Asbestos Compliance Work Plan (Attachment A) describing the means and <br />methods of asbestos related work prior to work commencing. <br /> <br />C. Related Sections: <br /> <br />1. Division 01 Section "General Requirements." <br /> <br />2. Division 01 Section "Special Procedures." <br /> <br />3. Division 01 Section "Cutting and Patching." <br /> <br />4. Division 01 Section "Selective Demolition." <br /> <br />5. Division 05 Section "Structural Steel." <br /> <br />6. Division 09 Section "Painting." <br /> <br />1.2 DEFINITIONS
The URL can be used to link to this page
Your browser does not support the video tag.