My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment C - Biddding Specification 1-23-25
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Attachment C - Biddding Specification 1-23-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:22:18 AM
Creation date
2/20/2025 9:18:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 028200 Asbestos Abatement-2 <br /> <br />A. Asbestos-In-Construction Supervisor (Competent Person): One who is capable of <br />identifying existing and predicting asbestos hazards in the surroundings or working <br />conditions and who has the authorization to take prompt corrective measures to <br />eliminate them. <br /> <br />B. Asbestos 30-minute Excursion Limit (EL): 1.0 fiber per cubic centimeter of air (1.0 f/cc). <br /> <br />C. Asbestos-in-air, 8-hour Time Weighted Average (TWA) Permissible Exposure Limit (PEL): <br />0.1 fiber per cubic centimeter of air (0.1 f/cc). <br /> <br />1. Refer to Division 01 Section "General Requirements" for the list of applicable <br />regulatory requirements. <br /> <br />1.3 SUBMITTALS <br /> <br />A. Submit under provisions of Division 01 Section "General Requirements" for review and <br />approval by the University’s Project Manager <br /> <br />B. Product Data: Submit [five (5)] copies of the following: <br /> <br />1. Material Safety Data Sheets (MSDS) sheets for each product containing <br />hazardous materials as defined by OSHA’s Hazardous Communication Standard; <br />29 CFR 1910.1200. <br /> <br />C. Quality Assurance/Control Submittals: Submit [five (5)] copies of the following: <br /> <br />1. Asbestos Compliance Work Plan: Detailed, job-specific plan of the procedures <br />proposed for use in complying with the requirements of this Specification and 29 <br />CFR 1926.1101. <br /> <br />a. As a minimum, provide the information required in Attachment A, the <br />Asbestos Compliance Work Plan Outline. Make note that LBNL requires <br />TSI glove bag work be performed inside a HEPA filtered negative <br />pressure enclosure that must be cleared by air sampling prior to removal <br />of the NPE. <br />b. The plan shall be approved by the University prior to the mobilization of <br />equipment, supplies, or workers to the site. <br /> <br />2. Worker Certification: Current asbestos worker certifications for personnel to be <br />engaged in the work of this Section. Workers will not be permitted on the <br />project site until the submittal is complete and has been accepted by the Project <br />Manager. Provide the following information for each worker: <br /> <br />a. Employee quantitative respirator fit-test records that identify the testing <br />agency, the individual fit test exercise fit factor results, and the overall fit <br />factor result; <br />b. Employee medical approval to wear respirator protection records; <br />c. Current AHERA-certified asbestos contractor supervisor certificate(s) and <br />training for the designated contractor supervisor only; <br />d. Current AHERA-certified asbestos worker certificate(s) and training; and
The URL can be used to link to this page
Your browser does not support the video tag.