My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment C - Biddding Specification 1-23-25
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Attachment C - Biddding Specification 1-23-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:22:18 AM
Creation date
2/20/2025 9:18:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 032100 Reinforcing Steel-4 <br />Drawings. <br /> <br /> <br />2. Where indicated or accepted, conform to AWS Dl .4 using AWS / WABO <br />Certified Welders, E9018 electrodes or as accepted by Engineer. Conform to <br />additional provisions of Section 05 5 000. <br /> <br />PART 3 - EXECUTION <br /> <br />3.1 PREPARATION <br /> <br />A. Clean reinforcing steel of loose rust, mud, dirt, debris, oil, and other foreign <br />substances that may affect bond. <br /> <br />3.2 INSTALLATION <br /> <br />A. Placement of Reinforcing Steel and Tolerances: Conform to IBC Chapter 19, ACI <br />318, and ACI 11 7. <br /> <br />B. Details of Placement and Support of Reinforcing Steel: Conform to ACI 31 5 <br />and CRSI recommendations, as shown on accepted placement drawing <br />submittals. <br /> <br />C. Displacement of Reinforcing: Where displaced, shifted, or moved to locations <br />exceeding allowable tolerances, prior to placing concrete: <br /> <br />1. Provide 48 hours' notice to Engineer. <br /> <br />2. Obtain acceptance for resulting arrangement. <br /> <br />D. Joints: Place reinforcement through expansion joints and as specified or <br />shown on Drawings through construction and contraction joints. <br /> <br />E. Allowable Cover Over Reinforcement: Conform to IBC Chapter 19 and as <br />shown on Structural Drawings. Where not shown, provide minimum 3- <br />inch cover. <br /> <br />F. Tie Wires: Bend or turn as necessary to prevent exposure of wires through <br />concrete placement. <br /> <br />G. Welded Wire Fabric: <br /> <br />1. Place continuously where shown in slabs between control and expansion <br />joints. <br /> <br />2. Do not carry through expansion joints. <br /> <br />3. Cut 1 / 2 of fabric through control joint s, except as otherwise shown on <br />Drawings <br />4. Extend across beams and walls.
The URL can be used to link to this page
Your browser does not support the video tag.