My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment C - Biddding Specification 1-23-25
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Attachment C - Biddding Specification 1-23-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:22:18 AM
Creation date
2/20/2025 9:18:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 033000 Cast-in-Place Concrete-16 <br /> <br />change. <br />3. Air Content: ASTM C 231, pressure method, for normal-weight concrete; one <br />test for each composite sample, but not less than one test for each day's <br />pour of each concrete mixture. <br /> <br />4. Concrete Temperature: ASTM C 1064; one test hourly when air <br />temperature is 40 deg F and below and when 80 deg F and above, and one <br />test for each composite sample. <br /> <br />5. Compression Test Specimens: ASTM C 31. <br /> <br />a. Cast and laboratory cure one set of four standard cylinder <br />specimens for each composite sample. <br />b. Where the Contractor intends to remove load supporting forms <br />(when conditions permit), cast and field cure one set of four <br />standard cylinder specimens for each composite sample. Field <br />curing shall continue up to within four hours prior to laboratory <br />testing. The Contractor shall be responsible for the safe field <br />storage of the concrete cylinders during the field curing process. <br /> <br />6. Compressive-Strength Tests: ASTM C 39; test one laboratory-cured <br />specimen at 7 days and two specimens at 28 days. The fourth cylinder shall <br />be held for testing as a check cylinder. <br /> <br />a. A 28-day compressive-strength test shall be the average <br />compressive strength of two specimens obtained from same <br />composite sample. <br /> <br />7. Test results shall be submitted in writing to Engineer, concrete <br />manufacturer, and Contractor within 48 hours of testing. Reports of <br />compressive-strength tests shall contain: <br /> <br />a. Project identification name and number <br />b. Name of concrete testing and inspecting agency <br />c. Date of concrete placement <br />d. Date of compressive strength test <br />e. Location of concrete batch in Work Design compressive strength at <br />28 days <br />f. Mix design designation <br />g. Slump of concrete <br />h. Temperature of concrete at placement <br />i. Percent air entrained <br />j. Number of specimens tested <br />k. Compressive breaking strength <br />l. Type of break for both 7- and 28-day tests <br /> <br />8. Strength of each concrete mixture will be satisfactory if every average of any <br />three consecutive compressive-strength tests equals or exceeds specified <br />compressive strength and no compressive-strength test value falls below <br />specified compressive strength by more than 500 psi. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.