My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment C - Biddding Specification 1-23-25
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Attachment C - Biddding Specification 1-23-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:22:18 AM
Creation date
2/20/2025 9:18:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 034700 Site Concrete-3 <br />3.3 CURING MATERIALS <br /> <br />A. Absorptive Cover: Burlap cloth made from jute or kenaf, weighing approximately nine (9) <br />ounces per square yard, complying with AASHTO Designation M182, Class 2. <br /> <br />B. Moisture-Retaining Cover: One of the following, complying with ASTM Designation C171. <br /> <br />1. Waterproof paper. <br /> <br />2. Polyethylene film. <br /> <br />3. White burlap-polyethylene sheet. <br /> <br />C. Other controls shall be as approved by the Engineer. <br /> <br />3.4 CONCRETE MIX <br /> <br />A. The Contractor shall comply with the FDOT’s Standard Specifications for Highways and <br />Bridges following design mixes as indicated on the Contract Drawings. <br /> <br />1. Minimum 3000 psi, air-entrained, for covered underground concrete. <br /> <br />2. Minimum 4000 psi, air-entrained, for exposed concrete surface work. <br /> <br />B. The Contractor shall add air-entraining admixture at the Manufacturer's prescribed rate to <br />result in concrete at point of placement having an air content as follows with a tolerance of plus <br />or minus 1½ percent: <br /> <br />1. Air Content: 5.5 percent for 1½-inch maximum aggregate. <br /> <br />2. Air Content: 6.0 percent for 1-inch maximum aggregate. <br /> <br />3. Air Content: 6.0 percent for 3/4-inch maximum aggregate. <br /> <br />4. Air Content: 7.0 percent for 1/2-inch maximum aggregate. <br /> <br />C. Adjustment to Concrete Mixes: Mix design adjustments may be requested by the Contractor <br />when the characteristics of materials, project conditions, weather, test results or other <br />circumstances warrant. <br /> <br />3.5 CONCRETE MIXING <br /> <br />A. Ready-Mixed Concrete: the Contractor shall comply with the requirements and with ASTM <br />Designation C94. When the air temperature is between 85 °F and 90 °F, the Contractor shall <br />reduce the mixing and delivery time from 1.5 hours to 75 minutes. When the air temperature <br />is above 90 °F, the Contractor shall reduce the mixing and delivery time to 60 minutes. <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.