My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment C - Biddding Specification 1-23-25
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Attachment C - Biddding Specification 1-23-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:22:18 AM
Creation date
2/20/2025 9:18:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br /> <br />Project No. 21-1011 November 2024 013216 CONSTRUCTION SCHEDULES-2 <br />Rates of Production <br />b. Removal and disposal activities <br /> <br />4. The schedule will be printed on a 11" x 17" sheet suitable for reproduction. The <br />Contractor will submit 3 copies of this schedule. <br /> <br />5. A written narrative on separate 8 1/2” x 11” sheets will be included with the <br />contractor’s final schedule. This narrative will describe the contractor’s general <br />approach for performing the work and any additional or unusual requirements <br />not clearly represented in the schedule including, but not limited to, equipment <br />to be used and the time equipment is to be on-site, anticipated delivery dates for <br />material and equipment, crews and crew sizes, estimated quantities and rates of <br />production. The narrative shall explain the basis for the contractor’s <br />determination of durations for major work items and describe his approach for <br />meeting the interim and final completion dates in his schedule. The narrative <br />shall also address workdays per week, hours per shift, rain days, holidays or any <br />other non-work periods that the contractor is assuming in the planning of the <br />work. Activities which may be expedited by the use of overtime or additional shifts <br />shall be identified. Sequencing and other restraints such as manpower, material <br />or equipment shall be identified and explained. A form to be used by the <br />Contractor to prepare his baseline narrative is included as Attachment 1 to this <br />section. <br /> <br />6. When completed, the schedule shall be submitted to the Representative for <br />approval. The Contractor shall incorporate the Representative's schedule review <br />comments within 10 days after receipt. The Representative shall be the final <br />authority in deciding the acceptability of the schedule. Upon approval by the <br />Representative, this shall become the Final Schedule for the contract. No <br />deviations from the final schedule will be allowed without the approval of MDC. <br /> <br />7. The Contractor shall identify all available float or slack time in his schedule in a <br />format suitable to the Representative. Float or slack time is not for the exclusive <br />use or benefit of either the Contractor or MDC. Float or slack time is considered <br />project float as it is for the benefit of both parties. As such, it is not to be used <br />exclusively by either party, but is to be used by the party that needs it first. No <br />more than 15% to 25% of the activities in the contractor's schedule may be on <br />or near the critical path. ("Near the critical path" is defined as any activity having <br />float of 10 days or less) <br /> <br />2.2 MONTHLY SCHEDULE UPDATES <br /> <br />A. The Contractor shall submit monthly schedule updates to show progress, as applicable, <br />on all activities in progress. Such progress shall be shown in a format suitable to the <br />Representative. Three 11” x 17” copies of the updated schedule shall be submitted by <br />the Contractor. <br /> <br />B. The Contractor shall submit on a weekly basis a simplified two-week look- ahead bar <br />chart schedule showing all anticipated work scheduled to take place during the next 14 <br />calendar days. This two-week look-ahead schedule shall be based on the approved <br />baseline schedule. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.