<br /> <br />THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 021100 -2 <br />A. The CONTRACTOR shall provide access to the WORK for the ENGINEER as requested for <br />inspection. The Contractor shall provide 48 hours’ notice of its intention to begin new <br />WORK activities. <br /> <br />1.9 WARRANTY: (Not Used) <br />PART 2 - PRODUCTS NOT USED <br />PART 3 - EXECUTION <br /> <br />3.1 GENERAL CLEARING <br /> <br />A. The CONTRACTOR shall remove the majority of the above grade non-native vegetative <br />matter in the areas indicated on the plans. The CONTRACTOR shall complete the work of <br />Clearing and Land Preparation as outlined below. <br /> <br />1. Mowing or the use of a bush-hog may be required in areas of heavy grass, weeds, <br />or woody-stalked vegetation. <br /> <br />2. Completely remove all designated exotic/hazardous trees within the designated <br />project boundaries. <br /> <br />3. All woody debris that measures over three-quarters inch in diameter and longer <br />than 18-inches shall be removed. <br /> <br />4. All stumps shall be ground level to six inches below the surrounding ground level. <br />Stumps on the slopes shall be cut flush with the natural angle of the existing grade <br />and treated immediately with a herbicide approved by the Engineer. All seedlings <br />within the project site shall be treated with the herbicide. <br /> <br />5. All plant material (whole or chipped) will be removed from the project area and <br />stockpiled at a location authorized by the ENGINEER. Disposal of the stockpile <br />shall be accomplished at a maximum of every 15 workdays. <br /> <br />6. Remove any garbage or other waste debris recovered during clearing. <br /> <br />7. On completion of the clearing, remove all sticks, rubbish and other extraneous <br />material and rake the ground surface in order to leave a smooth and clean <br />appearance. <br /> <br />8. Clearing and land preparation shall proceed sufficiently ahead of earthwork <br />activities to minimize disruption and allow time for determination of the adequacy <br />of the clearing procedure. <br /> <br />9. All work shall be performed in accordance with approved principles of modern <br />arboricultural methods. <br /> <br />10. All trees to remain in the project area, as designated by the ENGINEER, shall be <br />protected from damage by tree barricades. <br /> <br />11. All work shall be performed without damage to existing amenities, including trees <br />and shrubs. The CONTRACTOR shall be responsible for repair and replacement of