My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment C - Biddding Specification 1-23-25
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Attachment C - Biddding Specification 1-23-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:22:18 AM
Creation date
2/20/2025 9:18:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br />Project No. 21-1011 November 2024 021100 -3 <br />existing amenities to the satisfaction of the ENGINEER. The CONTRACTOR shall <br />protect all vegetation, habitats, or amenities on the project location as indicated <br />on the plans. <br /> <br />B. The CONTRACTOR shall clear adjacent to cut or fill sections to a minimum distance of 10 <br />feet outside of slope lines unless lesser distances are specified. Clearing in areas of native <br />vegetation for levee construction or removal and canal excavation shall be limited to a <br />distance of 10 feet outside of slope lines. <br /> <br />C. The CONTRACTOR may burn combustible products of the clearing operation on the site <br />with the written approved of the ENGINEER and with permission of the local authorities. <br />The CONTRACTOR shall comply with all local ordinances or regulations for burn locations <br />and methods, including methods for preventing uncontrolled spread of the burn. The <br />CONTRACTOR shall provide the ENGINEER with copies of permits prior to burning. <br /> <br />D. The CONTRACTOR may not burn cleared materials within the limits of any utility right-of- <br />way without written permission of the controlling agency. The CONTRACTOR will be <br />required to collect and haul all cleared materials to an approved site for burning and <br />disposal. <br /> <br />E. The CONTRACTOR shall limit burning to days when groundwater levels are adequate to <br />prevent ignition of peat soils located throughout the project areas. <br /> <br />F. The CONTRACTOR shall haul all organic materials and residues left from burning operations <br />to an approved landfill or disposal site. <br /> <br />3.2 CLEARING WITHIN AREAS OF NATIVE VEGETATION: <br /> <br />A. The CONTRACTOR shall remove exotic trees/plants, hazardous material, trash, and debris <br />and leave the site clean with a smoothly raked finish grade. Every reasonable effort shall <br />be made to protect native vegetation designated to remain, such as Coco Plum, Salt Bush, <br />Pond Apples, Leather fern, etc. Areas disturbed by work operations, such as, but not <br />limited to, access points beyond the limits of the right-of way, shall be restored to original <br />or better condition, including, but not limited to, filling, grading, sodding, and <br />seeding/mulching as direct by the ENGINEER. <br /> <br />END OF SECTION <br />
The URL can be used to link to this page
Your browser does not support the video tag.