My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Attachment C - Biddding Specification 1-23-25
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
INVITATION TO BID 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
>
Attachment C - Biddding Specification 1-23-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2025 9:22:18 AM
Creation date
2/20/2025 9:18:50 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
City Annex Building Construction Renovations
Bid No. (xx-xx-xx)
25-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
960
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project No. 21-1011 November 2024 022840-2 <br />THE CITY OF SUNNY ISLES BEACH <br />PROJECT NO. 21-1011 <br />BUILDING DEPARTMENT RELOCATION TO ANNEX <br /> <br /> <br />agencies having jurisdiction over use of soil poisons. <br /> <br />D. Provide warning signs and instruct workers to use protective measures for their safety. <br /> <br />1.4 WARRANTY <br /> <br />A. Upon completion of soil treatment and as a condition of final acceptance, furnish Owner with <br />a written warranty from the applicator, stating that: <br /> <br />1. Application was made at concentration, rates, and methods which comply with <br />these specifications. <br /> <br />2. Effectiveness of treatment is warranted for not less than 5 years without <br />additional cost to Owner, by means of a 5-year repair and replacement bond. <br /> <br />3. Upon evidence of subterranean termite activity, affected area will be retreated at no <br />additional charge to Owner. Additional treatment shall be sufficient to prevent <br />termites from attacking building or its contents. <br /> <br />4. Upon occurrence of damage to building or to its contents within warranty <br />period, affected area will be retreated and damage replaced at no cost to Owner. <br /> <br />5. Warranty bond shall be drawn in favor of Owner, successor, or assigns and shall <br />be non-cancellable by all parties to the contract except Owner. <br /> <br />PART 2 - PRODUCTS <br /> <br />2.1 MATERIALS <br /> <br />A. Provide materials approved by EPA and Florida Department of Agriculture. <br /> <br />B. The following materials are acceptable, subject to compliance with paragraph A: <br /> <br />1. Velsicol Chemical Corporation, Gold Crest Tribute. <br /> <br />2. FMC Corporation, Dragnet FT. <br /> <br />3. ICI Americas Inc., Demon TC. <br /> <br />4. Mobay Corporation, Pryfon. <br /> <br />5. Dow Chemical Company, Dursban TC. <br /> <br /> <br />PART 3 - EXECUTION <br /> <br />3.1 EXAMINATION <br /> <br />A. Do not proceed with the work until conditions detrimental to the proper and timely <br />completion of the work have been corrected in an acceptable manner.
The URL can be used to link to this page
Your browser does not support the video tag.