My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LUNACON CONSTRUCTION
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
Responses
>
LUNACON CONSTRUCTION
>
LUNACON CONSTRUCTION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2025 1:14:15 PM
Creation date
3/10/2025 1:09:53 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LuNACON- <br />YOUR CONSTRUCTION PARTNER <br />QC Manager —Juan Carlos Seife, Reports to President/ Program Manager as QC Manager: <br />• Develop, review, and enforce QC Program, plans and procedures. <br />• Issue stop -work orders for non-compliant work. <br />• Perform QA Audits <br />• Enforce QC Program/Plan compliance, as fully authorized by the CEO <br />• Develop, maintain, and enforce QC Program requirements and addenda. <br />• Ensure all deliverables are of the highest quality. <br />• Ensure qualifications of onsite QC representatives. <br />Project Based Organizational Chart <br />Emibo Criado <br />PrtS�VAC[1ngOpen•tionsManpn <br />Chrislopher Corona ChrtslopFter Mckenzie 3uan Carlos 5er4e <br />pmp" Manager SaIny Manager 51.stglrr1n1tr1dcnt <br />Document Cost Central 5chedWn Ems+ etlr 4sadty Con trel Tea& Pan hers <br />Lunacon Engineering Group Corp dba. Lunacon Construction Group <br />ITB No. 25-01-01 City Annex Building Construction Renovations <br />Due Date: 05 March 2025, 4:30 PM <br />31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.