My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LUNACON CONSTRUCTION
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(25-01-01) City Annex Building Construction Renovations
>
Responses
>
LUNACON CONSTRUCTION
>
LUNACON CONSTRUCTION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2025 1:14:15 PM
Creation date
3/10/2025 1:09:53 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LUNACON PROJECT EXPERIENCE <br />Performed as the Director of Construction Operations and Sr. Project Manager for Specific multi- <br />year IDIQ Contracts under Lunacon. Following sample of projects represent work completed under <br />multi-year contracts for various federal agencies. <br />• US Department of the Interiors - <br />Rehabilitate Flamingo Visitor Center, Everglades <br />Natl' Park, Miami -Dade County, Florida - $9.8M <br />Led Construction Team in the Re -purpose and <br />renovation of the former Flamingo concessions <br />restaurant and gift shop into the new Guy <br />Bradley Visitor Center and the renovation of the <br />Law Enforcement Wing (current Ranger Station). <br />The facility roof structure and roof system, which <br />was damaged in pre-vious hurricanes will be <br />replaced in full with a new modified bitumen <br />roof system. <br />Managed Ft. Stewart SATOC $16,000,000 IDIQfor <br />3 years which included the following jobs: <br />• Ft. Stewart SATOC $16,000,000 <br />• Ft. Stewart SATOC TO Renovation of <br />Building 225 $456,285 <br />• Ft. Stewart SATOC TO Building 937 <br />Addition$658,449 <br />• Ft. Stewart SATOC TO Concrete Pads at <br />UAS Hangar $81,766 <br />• Ft. Stewart SATOC TO Organizational <br />Storage Facility $489,109 <br />;1,077,565 Fort Stewart SATOC TO Taxiway D <br />4000,000 Cape Canaveral USAF SABER (01) <br />• Cape Canaveral USAF SABER (02) <br />$4,000,000 <br />;3,500,000 Cape Canaveral USAF SABER (03) <br />;10,100 Patrick AFB, Facility 62610 HVAC Repairs <br />• Patrick AFB, Facility 1348 $458,864 <br />• Patrick AFB, Facility 54915 $79,164 <br />• Patrick AFB, Facility Pavilion $387,619 <br />• Patrick AFB, Conex Buildings $171,375 <br />• Patrick AFB, Fire Climbing Tower $599,735 <br />• Provided construction services for Florida <br />National Guard and USAF Reserves for work in <br />South Florida. <br />• Homestead ARB Control Tower Building, <br />$484,522 <br />• Homestead ARB, National Guard Armory <br />Building $1,004,837 <br />• Homestead ARB Repairs to Runway <br />$1,295,465 <br />• Homestead Air Reserve Base Alter <br />WestParking Area $289,395 <br />Lu"FACc3I <br />C0H2TF,QCTv0" Q&044P <br />
The URL can be used to link to this page
Your browser does not support the video tag.