My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2025-3887
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2025
>
Reso 2025-3887
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2025 10:36:50 AM
Creation date
10/23/2025 9:25:12 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2025-3887
Date (mm/dd/yyyy)
09/18/2025
Description
Approving Agrmnt w/ Keith & Assoc., Inc, to Provide Landscape Architecture, & Electrical Engineering Svcs to design Parking Lot Sunny Isles Blvd.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 13, 2025 / Page 8 of 8 <br />11723.14 — SR 826 Service Road Parking Lot - City of Sunny Isles Beach <br />City of Sunny Isles Beach <br />COMPENSATION <br />Consultant will invoice the City for services rendered under this Agreement on a lump sum basis, <br />unless otherwise stated, and in accordance with the terms and conditions of the Continuing <br />Services Agreement for Professional Engineering Services between the City of Sunny Isles Beach <br />and KEITH. <br />Table 2 Budget Estimate of Engineering Services <br />"CITY": <br />CITY OF SUNNY ISLES BEACH <br />By: <br />CONSULTANT: <br />KEITH <br />By: <br />ALEX LAZOWICK <br />President <br />Engineering Inspired Design. <br />0 <br />Task 001 — Team Meetings and Meetings w/ Permit Authorities <br />$3,000.00 <br />(Hourly/NTE) <br />Task 401 - Preliminary Design Development Plan Revisions <br />$3,000.00(Lump <br />Sum <br />Task 402 - Construction Documents (CD) — Final Engineering <br />$7,600.00(Lump <br />Sum <br />Task 403 - Engineering Permitting <br />$11,700.00(Lump <br />Sum <br />Task 501 - Electrical Construction Documents (CD) - SGM <br />$6,330.00(Lump <br />Sum <br />Task 701 - Construction Documents — Final Landscape (CD) <br />$5,000.00(Lump <br />Sum <br />Task 702 - Landscape Permitting <br />$6,500.00(Lump <br />Sum <br />Task 801 — Construction Administration <br />$35,000.00 <br />(Hourly/NTE) <br />Task 01Z - Reimbursables <br />$1,500.00 <br />As Needed <br />CONSULTANT'S TOTAL COMPENSATION <br />$79,630.00 <br />(Lump Sum) <br />DIRECT EXPENSES <br />TOTAL FEE <br />$79,630.00(Lump <br />Sum <br />"CITY": <br />CITY OF SUNNY ISLES BEACH <br />By: <br />CONSULTANT: <br />KEITH <br />By: <br />ALEX LAZOWICK <br />President <br />Engineering Inspired Design. <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.