Laserfiche WebLink
9. Please provide a pavement, marking, and signage plan signed and sealed by a <br />professional engineer registered in the State of Florida. Please ensure that the <br />appropriate pavement markings and signage are provided per MUTCD criteria. This <br />should include traffic control (stop signs), one-way signage, do -not -enter signs, <br />pedestrian crossing signs, and other key signage. <br />Kim ley Horn &Associates, Inc. 07/30/25 Response: Apavement marking and signage <br />plan signed and sealed by a professional engineer will be provided under separate cover <br />as part of the civil engineering submittals. <br />LSN Law, P.A. 07/30/25 Response: Please see Sheets C-200 and C-201 for Signage <br />and Marking Plan & Details. <br />TCG 08/19/25 Response: Addressed. <br />10. Please provide sight visibility triangles on the site plan at each of the driveway <br />connections. The sight triangles should also be depicted on the landscape plans and the <br />pavement marking and signage plans. The sight triangles along NE 6th Avenue should <br />meet FDOT criteria as outlined in the FDOT Design Manual (Section 212.11). <br />Figure 212.11.1 Clear Sight Triangles <br />d, dr <br />EOOO 01 Nalor R— <br />cm— <br />® TrJveled fY.ty — — <br />fee ' <br />{ Gtmir Of Clear Sight <br />_K:P R/IY 4rM <br />Limit or Clear Sight I ( Of CleaC—rr (Sight W Mai <br />Co"' CNO FOI OMe100ment And <br />NUnrenance Of CICar. Sight IYinOan <br />/AI Center of La <br />RQtc:Of a ► Q <br />Mind WNn Ra% 1 A.ad Ne tth a io. I/ic tc <br />Navinq Lett fe.g.. One-Y/ay Le/rA <br />z � <br />Kimley Horn & Associates, Inc. 07/30/25 Response: A site plan with site visibility <br />triangles at each of the driveway connections will be provided under separate cover as <br />part of the civil engineering submittals. <br />LSN Law, P.A. 07/30/25 Response: Please see Sheet C-200 for implementation of <br />Sight Visibility Triangles. <br />TCG 08/19/25 Response: Addressed. <br />® CORRADINO.COM 34 <br />