Laserfiche WebLink
JEANNELIA P. LIU, PE <br />SENIOR ENGINEER <br />Miami-Dade DTPW, Card Sound Rd Feasibility Study (2016-2021) - Provided detailed analysis of the existing condition of a <br />rural two-way 12-mile segment connecting Miami-Dade County with Monroe County. Included roadway conditions and <br />characteristics assessments (typical section, cross slope, transitions, pavement among others), and traffic operations <br />assessment at main intersections. Conducted detailed 5-year crash analysis, supplemented by future conditions report with <br />recommendations and safety improvementsto increase driver safety and improve the usability of the corridor for multiple modes <br />of transportation by the inclusion of shared multi-use path. Included development and selection of multiple typical section <br />alternatives; evaluated constructability, environmental impacts, safety, usability, and costs. Contact: Rolando Jimenez, Miami- <br />Dade Dept of Transportation & Public Works, 305-375-5681, rolando.jimenez@miamidade.gov <br />FDOT D6 | Districtwide Freight Logistics & Pax Consultant Services, Miami-Dade County, FL,(2015-2020) - Provided <br />engineering services necessary to support Rail, Transit, Freight, Seaport, and Aviation programs in Planning and Environmental <br />Management Office (PLEMO). Included quiet zone assessments, review of rail involvement for roadway projects, attendance at <br />pre-construction meetings on behalf of the Department, ERC review/coordination, and research cost estimates for railroad <br />improvements. Contract No. C9J21, FM 435140-1-12-01; Contact: Dionne Richardson, FDOT D6, 305-470-5292; Jessica <br />Dimmick, AICP, EIT, Renaissance Planning, 561-404-7261 <br />FDOT D6 | SR-A1A/Collins Avenue Multimodal Corridor/Frontage Road Repurposing/Lane Elimination Study (2020- <br />2023)–The projectconsistedof a multimodal corridor study along a 1.3-mile section of SR A1A/Collins Avenue from 4700 Block <br />to 5800 Block from MP 7.079 to MP 8.406/Indian Creek Drive. The purpose of this corridor study was to identify, develop and <br />evaluate potential multimodal improvements that will address existing and future mobility focusing on pedestrian, bicycle, and <br />transit needs in the area. The study also evaluated the feasibility of implementing dedicated transit lanes, bicycle lanes, and <br />additional crosswalks. Alternatives will examine providing these facilities through the potential elimination of the frontage road. <br />Contract: CA822, FM 434773-3-22-01; Contact: Nicole Estevez, Renaissance Planning, 703-776-9922, <br />nestevez@citiesthatwork.com <br />FDOT D4 | Districtwide Rail Consultant (2019-Present) | Evaluated the condition of 100 railroad crossing surfaces on the <br />South Florida Rail Corridor main line in Palm Beach and Broward counties. Visited each crossing to observe existing conditions <br />of pavement panels, sidewalks,and rails in addition to observed reactions of vehicles and drivers traveling through the crossing; <br />took photos to document existing crossing conditions, installed cameras to observe vehicle reactions and passage of trains, <br />ranked crossing to help FDOTR prioritize which should be programmed for repairs as soon as possible. Contract No. CA554, <br />FM 437083-2-12-01; Contact: Ann Mulligan, PE, Jacobs Engineering, 407-903-5256, ann.mulligan@jacobs.com <br />FDOT D6, SR-976/Bird Rd Planning Study from SR 821/HEFT to US-1,(2016-2018) - Major EW principal arterial critical in <br />facilitating movement of local and regional traffic in central Miami-Dade County. Analyzed Coral Gables segment between Red <br />Rd/US-1, including existing conditions, identification of recurring congestion locations, evaluation of multimodal transportation <br />improvement needs based on future travel demand, identification of conceptual improvements for congested locations along <br />segment; provided recommendations for future improvements.Contract: C9R17, FM 434845-4-22-01; Contact: Godfrey <br />Lamptey, P.E., PTOE, Goal Associates, 786-600-3350, godfrey.lamptey@goaleng.com <br />SMART Plan TPO Consultant, (2017-2024)-Sub-consultant to Atkins, responsible as traffic engineering advisor for evaluating <br />EW corridor Land Use Scenario and Vision Plan. Included literature reviews, data gathering, participation in corridor charrettes, <br />evaluation of STRAVA data to estimate pedestrian and bicycle activity trips along transitway corridor and at proposed stations <br />to identify need for access improvements, bike parking, and other amenities to eliminate barriers and maximize comfort of non- <br />motorized patrons based on proposed stations. Included similar pedestrian/bikes analysis for beach and northeast corridor. <br />Contract No. Miami-Dade E-17-TPO-01, Contact: Jack Schnettler, Atkins North America, Inc., 305-514-3369 <br />FDOT D6 | Transportation Statistics #1 (2017-2021) | Multiple assignments, including evaluation of performance measures <br />using HERE data (big data) for periodic network traffic monitoring. Provided traffic data collection and highway assist inventories <br />as part of TCI and RCI programs, provided engineering in-house support, and developed 18-Kip pavement loads for multiple <br />projects. Contract No. C9X57, FM 252071-1-12-10; Contact: Neil Lyn, FDOT D6, 305-470-5373