CARLOS M. PEREZ, PE
<br />SENIOR ENGINEER
<br />PortMiami Tunnel Miami-Dade County | Oversight Consultant Contract (2014-2020) | Consisted of operations and
<br />maintenance performance monitoring consulting for Port of Miami tunnel concessioner. Responsible for reviewing monthly
<br />maintenance reports for traffic data and correlation of ITS devices with data gathered through other means, such as TTMS
<br />and/or video inventory. CALTRAN conducted field audits as FDOT representative on an as-needed basis. FAP No. C9E46.
<br />Contact: Edgardo San Miguel, CSA Group, 305-461-5484 x 250; Victor Ortiz, 786-566-8035
<br />City of Miami Gardens | Continuing Architectural and Engineering Services (2014-2020) | Provided traffic and roadway
<br />design engineering services for projects authorized by City. Included plats review and survey acceptance for 15+ plats, traffic
<br />impact peer review process for Walmart, Family Dollar Store, and Top Golf driving range. Advising role as part of noise
<br />evaluation study to implement F1 race track at Hard Rock Stadium, evaluation of plats and site plans, serve as a peer reviewer
<br />for traffic impact and parking variances applications.Contract No. ITB No. 18-19-008, Contact: Tom Ruiz, Public Works Director,
<br />786-279-1260, truiz@miamigardens.fl.gov
<br />BCC Engineering | SR 5/ Federal Highway from S of 10 Ave to 6 Ave N Palm Beach County (2022-Present) | Project
<br />Engineer in charge of providing: Lighting Analysis and Plan, Traffic calming and safety measures along SR-5 / Federal Highway
<br />from S of 10th Ave to 6th Ave N (MP 0.773 to MP 2.071) as part of the resurfacing, restoration, and rehabilitation (RRR) project
<br />(446173-1) to provide design services to add new pedestrian signals. Contract: CAE71, FM No. 447670-1-32-01; Contact: BCC
<br />Engineering, Carlos Alcantara, 954-928-1828, calcantara@bcceng.com (2021-21-03)
<br />Constructive Engineering|SR 80 from East of Parker Ave to West of Washington (2019-2021)|Project Engineer in charge
<br />of upgrading existing roadway lighting along SR-80/Southern Boulevard from east of Parker Avenue (MP 20.393) to west of
<br />Washington Road (MP 21.158). as part of the resurfacing, restoration, and rehabilitation (RRR) project the project limits extend
<br />for a gross length of 0.718 miles with a project exception for bridge number 930053 from MP 20.557 to MP 20.779 that will fall
<br />under FPID 446101-2-52-01. Contract: CA739 FM446101-1-32-01- Contact: Kashif Iftikhar, P.E., Constructive Engineering,
<br />561-713-1163, kashif@constructiveengineeringinc.com (2019-53-01)
<br />City of Sunny Isles Beach |Continuing Services Agreement (2022-Present) | Project Engineer responsible for assisting The
<br />City of Sunny Isles Beach with an electrical engineer and inspector to conduct site inspections of 126 lighting poles listed on
<br />Collins Avenue to identify deviations from the Florida Building Code 2014 and National Electrical Code 2011 (Codes) with the
<br />current installation. The light poles were installed as part of project 18073.00. Contact: City of Sunny Isles Beach, Christopher
<br />Russo, 305-792-1776 (2021-16-02)
<br />FDOT D6 | SR 994 / Quail Roost Dr. from East of SW 113
<br />th Avenue to East of HEFT On/Off Ramp (2009-2011) | Project
<br />Engineer responsible for design services for signalization improvements of .32 miles at the intersections of Quail Roost Drive
<br />and SW 113th Avenue, Quail Roost Drive and SR 821 (HEFT) Southbound on Ramp, and Quail Roost Drive and SR 821 (HEFT)
<br />Ramp B. Contract No.: C8W70, FM No.: 425644-1-32-01, Contact: Burns and McDonnell (786) 476-7834
<br />FDOT D6 | SR A1A / Collins Ave from 75th St to Harding Ave (2008-2010) | Project Engineer responsible for the design that
<br />included milling and resurfacing the road with slope correction, ADA improvements, and minor inlet relocation to accommodate
<br />ramps. Located in the City of Miami Beach, Surfside, and Town of Bal Harbor. Contact Burns & McDonnell (305) 476-7817
<br />FDOT D1, D4, D5, and D6 | Roadway Lighting, Florida Transportation Engineering, Inc., FL. (2004-2010) | He has
<br />performed field inventories and prepared Lighting Justification Reports (LRE) for several Department projects, including I-95 &
<br />Atlantic Blvd., Metro Parkway, Orlando's Western Beltway, US1 Bus Lane Design phase II, I-95 HOV Lanes, and SR 80
<br />City of Miami Beach Neighborhood Capital Improvement Program|Flamingo Neighborhood Improvements (2007-2010)
<br />| Project Engineer involved in the master plan verification, preliminary design, and cost estimating of above and underground
<br />improvements to the right-of-way infrastructure of the “Flamingo” neighborhood in Miami Beach. The Flamingo neighborhood
<br />encompasses more than a square mile of city streets. The scope of the work includes aboveground improvements including
<br />the streetscape design, street lighting, traffic calming, signage, parking studies, the final design of parking, traffic engineering,
<br />signalization, paving, grading, and ADA-compliance updates to walkways. Underground improvements include pipe upsizing
<br />and replacing water mains, wastewater mains, storm sewers, and installation of new deep. Contact Burns & McDonnell (305)
<br />476-7817
|