CARLOS M. PEREZ, PE
<br />SENIOR ENGINEER
<br />Miami-Dade County & FDOT| SW 328th St from SW 187th Ave to US-1 Signal Improvement (2016-2020) | Responsible for
<br />preparing contract documents including plans and specifications; supporting engineering analysis, calculations, and other
<br />technical documents in accordance with DTPW policy, procedures, and requirements for signalization improvements and school
<br />zone upgrades. Prepared cost estimates, performed field reviews, attended technical meetings, performed QA/QC, developed
<br />signalization plan, key sheets, pay items, tabulated quantities, and conducted post-design services. Contact: Ali Memari, Miami-
<br />Dade County Public Works, 305-375-3015, Almemari@miamidade.gov
<br />The City of Miami Beach | Oceanfront Neighborhood Right-of-Way Infrastructure Improvements (2007-2010) |Project
<br />Engineer responsible for the lighting design of this dense urban roadway rehabilitation project. SR AIA binds the Oceanfront
<br />neighborhoodto the east, Indian Creek Drive to the west, 43rd Street to the north, and 23rd Street to the south. The project area
<br />contained approximately 2 miles of local streets.
<br />Sun Life/HARD ROCK Stadium MOT Plans,(2013-Present) | Since 2013, responsible for designing engineering services for
<br />MOT plans per FDOT Standards for major detours along Florida's Turnpike connections from Golden Glades and HEFT during
<br />pre-and post-special-event traffic. Includes key sheets, lane closure analysis, project layout, tabulation of quantities using FDOT
<br />pay items, notes, special signing sheets, and detour route plans for all Dolphin games and special events at the stadium.
<br />Contact: Alan Riano, Miami Dolphins Corporate Headquarters, 305-943-6501, ARiano@dolphins.compre- and post-special-
<br />event traffic. Includes key sheets, lane closure analysis, project layout, tabulation of quantities using FDOT pay items, notes,
<br />special signing sheets, and detour route plans for all Dolphin games and special events at the stadium. Contact: Alan Riano,
<br />Miami Dolphins Corporate Headquarters, 305-943-6501, ARiano@dolphins.com
<br />FDOT D6 | Districtwide Freight Logistics and Passenger Service OPS Consultant Services, (2013-Present) | Served as
<br />Project Engineer; services include providing general management support, researching freight plans and ongoing freight project
<br />development, brainstorming advisory of freight and transit strategies and potential objectives for existing and future projects,
<br />reviewing freight and transit national and international trends, performing field assessments, assisting management with internal/
<br />external coordination of stakeholders. For MDT Bus System Evaluation, served as support for FDOT System Safety andSecurity
<br />Reviews of MDT, compliance with requirements of 14-90 FAC; assessed MDT documents such as System Safety Program
<br />Plan, System Security and Emergency Preparedness Plan, operating procedures; included on-site visits for triennial review
<br />activities; provided briefings of findings and reporting. For MOT Design, designed MOT for proposed closures, coordinated with
<br />stakeholders and MOT contractor, prepared plans including tabulation of quantities, notes, detour route plans, and coordinated
<br />plan reviews. For Construction Engineering and Inspection, provided personnel to audit rehabilitation of FEC and CSX railroad
<br />crossing in Miami; included maintaining a log of all activities performed by the contractor in the construction area and supply of
<br />inspector/engineer during the scheduled time of construction; staff provided the report of all activities and equipment used.
<br />Contact: Dionne Richardson, (305) 470-5292.
|