Laserfiche WebLink
NELSON GALEANO MsM, PE, PTOE, PTP, RSP1 <br />75$163257$7,21(1*,1((5 <br />PROFILE <br />Mr. Galeano has over 25 years of experience in traffic/ transportation engineering with a Master’s Degree in <br />Management. Mr. Galeano has knowledge of software to conduct transportation planning analysis and travel <br />demand forecasting. Working knowledge of state-of-the-art operations/micro-simulation software. He has <br />demonstrated talent in assessing investment decision analysis in the transportation sector under a public/private <br />perspective, utilizing financial models, cost/benefit, economic evaluation, programming, and planning of <br />transportation facilities (highway & transit) investment procedure. Mr. Galeano has utilized transportation <br />planning software (TransCAD, VISSIM, Cube, R, Synchro, HCS) and is the Discipline Director of the <br />Transportation Professional Certification Board (TPCB). <br />Key Projects <br />Manatee County | 2015-2021, 2023–2025 | Transportation System Engineer, Transportation <br />Planning Division Manager | As part of the Manatee County Transportation Planning Division staff in <br />different roles (transportation systems engineer and division manager), Nelson was directly involved in <br />the Traffic Impact Analysis (TIA) review of all site development plans. In terms of comprehensive plan <br />amendments Nelson directly participated on several mixed land use development such as Lake Flores <br />(1,300-acre infill), Peninsula Bay (375 acres), North East Sector (6,595 acres with 14,500 dwelling units <br />and 2,6 million of sq ft for office, retail and light industrial), and Gamble Creek (5, 040 acres with 1,152 <br />for residential, 1,108 mixed use, 200 for industrial, and 2,372 for agricultural among other standard land <br />uses). These traffic studies provided technical support for decision makers and other county teams <br />regarding thefuture of not only the land use but also the transportation infrastructure in Manatee County. <br />Of special interest is the review of the Northeast Sector Comprehensive Plan Amendment, whichserved <br />the Local Development Agreement (LDA 17- 01). The initial land use for the Northeast Sector, located <br />north of State Road 70, south of State Road 64, east of Lorraine Road, and west of Bourneside <br />Boulevard,comprised 15 discrete projects that included a total of 6,355 acres with initially 10,972single- <br />family detached units, and 8.1 million sq ft for office, retail, and light industrial. Although thesubsequent <br />amendment did not modify the total number of vehicle trips and no negative vehicular impact on the <br />roadway capacity has been identified, concerns regarding the mobility impacts have been explicitly <br />associated with limiting the mix of land uses and indirectly the form. The non-residential to residential <br />ratio was used to demonstrate that a reduction inthis ratio implied a significant increasein the trip length <br />between the initial land use and the new proposed one. Larger trips increase the vehicle miles of travel <br />VMT with undesirable impacts on health and the environment. The County repealed transportation <br />concurrency, and it required his deep participation in the definition of the new traffic study guidelines. <br />He was also fundamental tothe rewrite of the comprehensive plan. Contact: Clarke Davis,Public Works <br />Deputy Director, 941-356-1036, Clarke.davis @mymanatee.org <br />VHB | Senior Transportation Engineer | 2022-2023 | |Mr. Galeano performed engineering-related <br />duties as a lead project engineer, including transportation planning, traffic analysis, and design on <br />complex transportation projects, and plan preparation. He led production of design deliverables, <br />including plan preparation, reports, and technicalmemorandums. Client presentations to discuss project <br />goals, challenges, and solutions were part of his duties. He also led and/or was part of a multi- <br />disciplinary design team, including coordination with subconsultants. Mr. Galeano utilized QC/QA best <br />practices in compliance with VHB and client standards while delivering related services associated with <br />the construction bidding process and active construction. Finally, he led ad and/or was part of a multi- <br />disciplined team in business development activities, including proposal development, presentations, <br />scope of work, and fee development. Contact: Joedel Zaballero, P.E., PTOE, VHB, 407-929-5230, <br />jzaballero@vhb.com <br />Metroplan - Central Arkansas Council of Governments. Little Rock, Arkansas <br />(metroplan.org) | Modeler/Transportation Engineer | 2012 –2014 | Developed technical analysis for <br />travel demand modeling update. (Transit, Highway, Multimodal). Mr. Galeano reviewed and performed <br />traffic impact studies for regional/local transportation plan projects. Contact Cassey Covington, PE. <br />AICP. Executive Director 501-944-5823, ccovington@metroplan.org <br />EDUCATION <br />MS in Management <br />Hodges University, 2007 <br />Master in Transportation <br />Planning and Traffic <br />Engineering, Stuttgart <br />University, Germany 1996 <br />BS Civil Engineering <br />National University, <br />Colombia, 1989 <br />YEARS OF EXPERIENCE <br />Total 25 years <br />2025 - Present - CALTRAN <br />Manatee County 2023 - 2025 <br />REGISTRATIONS <br />ƒProfessional Engineer: <br />àFlorida No. 71559, 2010 <br />ƒProfessional Traffic <br />Operations Engineer, <br />No.3974, <br />ƒProfessional Transportation <br />Planner, No. 343 <br />Road Safety Professional <br />(RSP1)- No 920 <br />PROFICIENCIES <br />ƒProject Management <br />ƒIMSA Traffic Signal <br />ƒTraffic & Safety <br />ƒTransportation Planning <br />ƒTraffic & Transit <br />ƒSimulation & Modeling