|
NELSON GALEANO MsM, PE, PTOE, PTP, RSP1
<br />75$163257$7,21(1*,1((5
<br />Regional Planning Agency. Chattanooga-Hamilton County. Tennessee. (chcrpa.org) |Planning Analyst in Transportation | 2010
<br />–2011 | Mr..Galeano utilized transportation planning software for travel demand modeling (TransCAD & ArcGIS)for transit development.
<br />He developed and maintained regional transportation system performance measures and conducted regional transportation and land
<br />use scenario development, testing, and evaluation. One of his duties was to analyze data (household and transit on-board surveys) for
<br />statistical model estimation (SPSS). He also managed the OD transit onboard survey to incorporate public transit planning in
<br />transportation. Contact Melissa Taylor AICP, Transportation Planning Director 423-421-1106 Taylor-melissa@chattanooga.gov
<br />McMahon Associates -Fort Myers, Florida-US (Mcmtrans.com) | Project Engineer|2006-2009|Conducted traffic and travel demand
<br />modeling for traffic impact studies for commercial, residential, and mixed-use developments. (Traffic Impact Statements, Development
<br />of Regional Impact, Interchange Justification Report). Florida Standard Urban Transportation Model Structure (FSUTMS), Cube,
<br />Tranplan, TransCAD, Synchro, HCS, Turns, HCS, MUTCD. Prepared and submitted proposals for transportation analysis studies
<br />supporting private and public clients. This company has been absorbed by Bowman. Contact: Natalia Lercari 954-756-2505
<br />Nlercari@mcmahaonassociates.com
<br />Vanasse & Daylor at Weston & Sampson Engineers Inc. -Fort Myers, Florida-US | Engineering Designer | 2003-2006 |MR.
<br />Galeano authored and co-authored transportation analysis reports and presented study findings to senior management and clients.
<br />Traffic Impact Statements, Development of Regional Impact. He utilized transportation planning software such as Synchro©, TransCAD,
<br />AutoCAD, HCS2000TM,Turns, MUTCD, FSUTMS, and Cube to test a number of assumption scenarios for various studies.This company
<br />has been absorbed by Weston & Sampson.
<br />Public Sector Accountability/Comptrollership Office of Colombia | 2000-2002 | Director, Infrastructure Sector|Mr. Galeano led a
<br />team of 100 staff responsible for conducting audit analysis of nationwide public expenditure on infrastructure mega-projects. As
<br />comptroller, he was responsible for formulating the strategy of the General Auditing Plan for Infrastructure, Transportation,
<br />Telecommunications, Foreign Trade, and Regional Development.
<br />United Nations Development Program / National Planning Department of Colombia | Transportation Consultant | 1998 – 2000 |
<br />National manager of P3 (BOT) urban transportation projects such as: Metro of Bogotá, a 40- km toll highway in Bogotá, as well as Master
<br />Transportation Plans and BRT and LRT planning studies for the cities of Ibague, Bucaramanga and Cali utilizing financial models,
<br />cost/benefit, economic evaluation, programming, and planning of road investments procedures. He promoted technical mechanisms
<br />(traffic analysis and options) to facilitate the creation of execution and financial schemes for urban transportation projects with private
<br />participation at the national and local levels (Bogota, Colombia, South America) by using transportation simulation tools to advise
<br />municipalities to quantify the demand and supply for urban transportation. Mr. Galeano provided technical support such as roadway
<br />design, service design, transfer center design, analysis and costing, and technical operation of fixed-bus mass transit systems.
|