My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CALTRAN Engineering Group, Inc Bid Document
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
CALTRAN Engineering Group, Inc
>
CALTRAN Engineering Group, Inc Bid Document
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 12:37:39 PM
Creation date
8/31/2026 12:36:35 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ALVARO SAENZ SHEEN, PE, PTOE, RSP1 <br />TRAFFIC ENGINEER <br />Southbound Segment of SR 93 / I-75 from MP 1.06 to MP 3.75 Speed Study for FDOT (Districtwide Traffic Operations <br />Consultant) (2020) | In this study, I conducted field reviews to assess existing traffic conditions to identify issues in order <br />improve safety in the studied segment. I evaluated traffic data such as speed data by means of machine detection and radar in <br />order to obtain speed parameters such as 85th percentile speed, average speed, speed variance, and pace. I provided a crash <br />analysis of the studied segmentbased upon the latest five years of crash data. I performed a safe curve speed studyto determine <br />the advisory speed at which motorists would be able to safely negotiate the southbound direction of horizontal curve located at <br />MP 1.75. Finally, I provided recommendations that included the implementation of a transitional posted speed zone, installation <br />of speed control measures at the curved alignment, and installation of flashing speed feedback signs following the Manual of <br />Uniform Traffic Control Devices (MUTCD). Contact: Xaviel Llerena, (305) 470-5303, Xaviel.Llerena@dot.state. <br />SR 7/NW 7th Avenue at SR 25/NW 36th Street - Bottleneck Studies for FDOT (2019) | In this traffic study, I conducted field <br />reviews to assess existing traffic conditions and operations during AM Peak period in order to identify opportunities to improve <br />existing traffic congestion in the two studied intersections. I provided analysis and evaluation of existing and proposed traffic <br />operations using synchro 9.0 software. I provided recommendations that included removing an exclusive pedestrian phase, <br />implementing a concurrent pedestrian phase operating with through movements, and optimizing signal offsets and timing. <br />Contact: Xaviel Llerena, (305) 470-5303, Xaviel.Llerena@dot.state.
The URL can be used to link to this page
Your browser does not support the video tag.