Laserfiche WebLink
JUAN PABLO ROMERO, EI <br />TRAFFIC ENGINEER <br />and traffic-calming measures were provided to enhance pedestrian safety and traffic flow. <br />Contact Information: FDOT D6, Ramon Sierra, (305) 470-5303 <br />Traffic Signal Timing and Optimization Studies - Project Engineer | Aimed at improving traffic flow, reducing congestion, and <br />enhancing safety at intersections through the collection and analysis of traffic volume data, patterns, and existing signal <br />operations to identify inefficiencies. Responsibilities included optimizing signal phases—such as green, yellow, and red times— <br />and coordinating signals across multiple intersections to create green waves for smoother traffic progression. Utilized traffic <br />simulation tools, when necessary, to evaluate and validate timing adjustments. Provided data-driven recommendations to <br />reduce delays, improve safety, and support efficient traffic management strategies. <br />FDOT D6 | SR 968 / West Flagler Street at W 24th Avenue Through data collection, field inventory, Model Simulations, and <br />crash analyses, Mr. Romero evaluated the implementation of an exclusive pedestrian phase due to the significant number of <br />students (Miami Senior Highway) crossing at non-designated areas, posing safety concerns. Contact: Xavier Llerena, 305-470- <br />5402, xavier.llerena@dot.state.fl.us <br />FDOT D6 | SR A1A / Collins Avenue from 172nd Street through 183rd Street | Due to the increase in pedestrian volume <br />within the segment, Mr. Romero, using VISSIM/VISTRO software, measured the effects of implementingan exclusive pedestrian <br />phase. Contact: Xavier Llerena, 305-470-5402, xavier.llerena@dot.state.fl.us <br />FDOT D6 | SR 5 / US-1 South Dixie Highway – SW 232 Street to SW 112 Avenue and SR 5/US-1/S Dixie Highway - SW <br />264th Street to SW 232 Street |Through crash analysis, a qualitative assessment, and preliminary design reviews. Mr. Romero <br />evaluated safety countermeasures to enhance safety and healthy operations within the State Highway System. Contact: Xavier <br />Llerena, 305-470-5402, xavier.llerena@dot.state.fl.us <br />FDOT D6 | SR 972 / SW 40 Street / Bird Road at SW 72 Avenue | Mr. Romero evaluated the effects of implementing a north- <br />south pedestrian crosswalk facility to support pedestrian travel along the west leg of the intersection of SR 972 / SW 40 Street <br />/ Bird Road at SW 72 Avenue. Said evaluation was performed through data collection and VIISM / VISTRO simulations. Said <br />effects entailed the need for an eastbound left-turn bay storage length assessment, red/yellow clearances, and signal timing <br />field observations during the critical AM and PM period. Contact: Xavier Llerena, 305-470-5402, xavier.llerena@dot.state.fl.us <br />Sun Life/HARD ROCK Stadium MOT Plans (2013-2020) | Since 2010, responsible for designing engineering services for MOT <br />plans per FDOT Standards for major detours along Florida's Turnpike connections from Golden Glades and HEFT during pre- <br />and post-special-event traffic. Includes key sheets, lane closure analysis, project layout, tabulation of quantities using FDOT pay <br />items, notes, special signing sheets, and detour route plans for all Dolphin games and special events at the stadium. Contact: <br />Alan Riano, Miami Dolphins Corporate Headquarters, 305-943-6501, ARiano@dolphins.com <br />Heron Bay Community | Master Transportation Plan and Traffic Calming Improvements Design Project (2016-Present) | <br />Evaluated existing conditions of a community of 2,200 units in NW Broward County, including improvements to existing roadway <br />network quality for residents and visitors. Responsible for the design of proposed improvements, including assessing gate <br />entrance protocols, traffic calming strategies, and design of sidewalks and ADA ramps; assisted with the preparation of <br />construction cost estimates, and provided support during the bidding process. Contact: Randi Ellis, Heron Bay Community, 954- <br />575-220, rellis@castlegroup.com <br />Iron Triangle NW 36th St/NW 42nd Ave Interchange Feasibility Study (2016-2019) | Project provided alternatives for <br />improvements at the interchange of SR-112/Lejeune Rd and Okeechobee Rd. Included evaluation of existing conditions, traffic <br />data collection including big data evaluation for origin-destinations (HERE, Bluetooth, Streetlight), and operational analysis <br />microsimulation model development. Provided documentation for Design Traffic Technical Memorandum (DTTM), and assessed <br />conceptual improvements for Tier 1 and 2 including long- and short-term improvements. Provided final recommendations, <br />assisted with cost estimates, and supported public involvement. Contract No. FM 438521-1-22-01, Contact: Alfred Lurigados, <br />CH2M, 786-507-5921, Alfred.Lurigados@ch2m.com