|
STEVAN GONZALEZ, PE
<br />TRANSPORTATION ENGINEER
<br />the Roadway Atlas and Work Program Maps. Assignments included the production of various map sets developed for the
<br />department such as the Federal Functional Classification, Roadway Jurisdiction, Federal Aid System, State Highway System,
<br />Strategic Intermodal System (SIS), TSM&O, and various subset maps for County legislators. Contract No.: CAC17, FM 413221-
<br />1-12-05, Contact: Carlos Perez, 786-456-7700, cperez@caltrangroup.com
<br />FDOT D6 | Districtwide Modal Development Consultant Services (2018-Present) | Services include the provision of
<br />professional services in the review of multimodal plans and specifications, technical reports and studies, multimodal inspections
<br />and reports, project site visits, multimodal inventories, transit systems safety plans reviews, transit systems safety plans reviews,
<br />vehicle inventories, park and ride inspections, design services, and program administration for Aviation, Intermodal, Freight,
<br />Rail, Seaport and Transit services in Miami Dade and Monroe counties. Services provided include on-site support, development
<br />of Districtwide truck parking methodology and study, and plans reviews of MOTs for railroad crossings. Contract No. CA148,
<br />FM 432451-4-12-01, Contact: Dionne Richardson, FDOT D6, 305-470-5292, Dionne.Richardson@dot.state.fl.us
<br />FDOT D6 | Inhouse Support Freight,(2022-Present) | Assist the Department, Modal Development Office (MDO), in the
<br />performance of a diverse range of planning and engineering services as the in-term Freight Coordinator. Assignments included
<br />project management for various freight-related studies and coordination between the department and various partner agencies
<br />and public organizations. In-house from 2022-2023 with continuing services for off-site support to present. Contract CAE03, FM
<br />No. 439218-2-32-04, Contact: Carlos M. Cejas, Gannett Fleming, 786-845-9540
<br />FDOT D6 | Transportation Systems Planning & Statistics Support (2021-Present) | Multiple assignments; included Project
<br />Traffic/Travel Demand Forecasting, Mobility Performance Measures, Feasibility and Special Studies, Functional Classification,
<br />Transportation Plan Development, & Data Collection. Contract No.: CAL78, FM No. 252180-2-12-03, Contact: Ana M. Calleja,
<br />FDOT D6, 305-470-5283, AnaM.Calleja@dot.state.fl.us
<br />MIAMIDDA | Complete Streets (Lane Elimination), SW/SE 1st St from SW 2nd Ave to Biscayne Blvd (2016-2019) |Provided
<br />traffic engineering services as part of a feasibility study to apply Complete Streets concepts. Provided existing conditions
<br />analysis, traffic analysis for no build and build conditions, and transit system operation analysis. The study recommended lane
<br />elimination and 1st bus preferential lane only in Miami-Dade County. Responsible for design to apply a Complete Streets
<br />concept; included provided signing & pavement marking plans including bike lane and bus preferential lane. Responsible for
<br />before-after study evaluation of the Complete Streets concept; included survey, traffic and non-motorized data collection, safety
<br />evaluation, and travel time for vehicular and transit. Contact: Patrice Smith/Neal Schafers, 305-379-6566,
<br />schafers@miamidda.com
<br />Iron Triangle NW 36th St/NW 42nd Ave Interchange Feasibility Study (2016-2019) | Project provided alternatives for
<br />improvements at the interchange of SR-112/Lejeune Rd and Okeechobee Rd. Included evaluation of existing conditions, traffic
<br />data collection including big data evaluation for origin-destinations (HERE, Bluetooth, Streetlight), and operational analysis
<br />microsimulation model development. Contract No. FM 438521-1-22-01, Contact: Alfred Lurigados, CH2M, 786-507-5921
<br />FDOT D6 | Transportation Statistics #3,(2015-2017) | Multiple assignments; included Enhanced Pavement Management
<br />Program with the primary objective to develop a framework of reliable mechanisms to ensure and accurately identify all FDOT
<br />D6 pavement deficient segments to be assigned for scoping and gaming. Provided PTMS design services, coordinated and
<br />reviewed traffic data collection, and provided engineering in-house support. Contract C9617, FM No. 40819911203, Contact:
<br />Neil Lyn, FDOT D6 Project Manager, 305-470-5373, neil.lyn@dot.state.fl.us
<br />FDOT D4 | Districtwide General Planning Consultant (2015-2017) | Conducted multiple data collection assignments
<br />throughout the District for traffic data as part of annual data collection (TCI) or roadway inventory (RCI) programs. Contract No.:
<br />C9H68, FM 430256-1-12-01, Contact: Sheng Yang, CTS Engineering, 305-890-7198
<br />Golfview Market Place and Westview Logistic Center (2015-2017) | Traffic analyses that entail the potential traffic impacts,
<br />short-term roadway and circulation need identification, and the potential mitigation measures required to protect the public
<br />health, safety, and welfare for the mobility of people and goods while preserving the functional integrity of the State Highway
<br />System. Contact: Schwebke-Shiskin & Associates, John Tello, 954-435-7010
|