Laserfiche WebLink
RFQ # 26-07-01 | CITY OF SUNNY ISLES BEACH 117 <br />CES CONSULTANTS, INC. <br />Christopher Bennett is a skilled civil engineer with 25 years of experience in infrastructure design, <br />construction management, and quality assurance/quality control for municipal and transportation <br />projects. His expertise includes overseeing roadway resurfacing, full-depth reconstruction, <br />stormwater and utility installations, and right-of-way improvements. As former Assistant Director of <br />Public Works for Miami and Fort Lauderdale, he has led large-scale capital improvement programs, <br />including Fort Lauderdale’s $250M infrastructure upgrade and Miami’s $400M Miami Forever Bond <br />program. Christopher has directed stormwater master planning, utility coordination, and compliance <br />efforts, ensuring adherence to local, state, and federal regulations. With a strong background in <br />process improvement, asset management, and resilience planning, he has implemented systems like <br />e-Builder and Cartegraph to streamline project execution and life-cycle management. <br />City of Fort Lauderdale, River Oaks Neighborhood Stormwater Improvements, Fort Lauderdale, <br />FL: Project Executive/QA Manager. Located between Davie Road, SW 9th Avenue, SR-84, and I-95, <br />this project was the largest stormwater infrastructure upgrade in the city’s history aimed at reducing <br />flood risk and improving water quality for runoff to the New River. Scope included installation of <br />26,000 LF of HDPE and RCP drainage pipe ranging from 12” to 72”, over 300 drainage structures, <br />exfiltration trenches, outfall energy dissipators, water quality structures, tidal backflow prevention <br />valves, and creek/canal dredging. Additional improvements involved the relocation of existing water <br />and sewer lines, cured-in-place pipe (CIPP) lining, pavement restoration, landscaping enhancements, <br />and swale reconstruction. <br />City of Fort Lauderdale, Durrs Neighborhood Stormwater Improvements, Fort Lauderdale, FL: <br />Project Executive/QA Manager. Project enhances neighborhood-wide drainage infrastructure to <br />reduce flooding and strengthen the area’s overall climate resilience, improve drainage efficiency, and <br />enhance community accessibility and safety. Scope included installation of 35,000 feet of stormwater <br />pipe, more than 250 drainage structures, and exfiltration trenches to improve flood management. <br />Additional improvements included relocating existing water and sewer lines, reconstructing swales, <br />pavement restoration, and installing new sidewalks to enhance neighborhood connectivity. <br />City of Fort Lauderdale, Edgewood Neighborhood Stormwater Improvements, Fort Lauderdale, <br />FL: Project Executive/QA Manager. This neighborhood-wide stormwater improvement project <br />reduces flooding, enhances stormwater management and water quality, and improves neighborhood <br />sustainability. Scope included installing over 5 miles of RCP and HDPE drainage pipe ranging from <br />15” to 66” in diameter, along with more than 350 stormwater inlet & manhole structures. Additional <br />improvements included utility relocations, tidal backflow prevention valves, exfiltration trenches, <br />landscape restoration & enhancement, and roadway re-grading and pavement restoration to reduce <br />flooding and enhance stormwater collection and conveyance. Upgrades provide more efficient water <br />discharge and long-term flood mitigation for the community. <br />City of Fort Lauderdale, River Oaks Pump Stations, Fort Lauderdale, FL: Project Executive/QA <br />Manager. Project involved the construction of two (2) stormwater pump stations with capacities of <br />66,000 gallons per minute (GPM) and 10,000 GPM, along with coffer cell and native landscaping <br />and fencing within and around the River Oaks Stormwater Preserve. The project also included <br />installation of collection system piping to connect the pump stations to the neighborhood’s <br />stormwater infrastructure and a major outfall pipe into the New River. The project provides flood <br />protection, improves water quality, and enhances sustainability for the River Oaks and Edgewood <br />neighborhoods and restored the Coconut Canal’s drainage capacity. <br />YEARS EXPERIENCE <br />25 <br />EDUCATION <br />Executive Certificate in Project <br />Management, Florida Atlantic <br />University 2015 <br />BS, Civil Engineering, University of <br />Alaska Anchorage, 2000 <br />REGISTRATIONS & <br />CERTIFICATIONS <br />Florida Professional Engineer <br />#63022, 2005 <br />Federal Emergency Management <br />Agency (FEMA) Certifications, 2014 <br />• IS-100 <br />• IS-200 <br />• IS-700 <br />• IS-800 <br />• G-300 <br />• G-402 <br />Certified Stormwater Operator <br />Levels 1 & 2, Florida Stormwater <br />Association, 2020 <br />CHRISTOPHER R. BENNETT, PE <br />Vice President; Technical Advisor & QA/QC