|
RFQ # 26-07-01 | CITY OF SUNNY ISLES BEACH 118
<br />CES CONSULTANTS, INC.
<br />Uri Aszodi is a transportation and roadway engineering leader with 23 years of experience delivering
<br />full life cycle projects across multiple FDOT districts and local agencies. His experience includes serving
<br />as Project Manager and Engineer-of-Record on complex resurfacing and reconstruction programs,
<br />integrating roadway design, temporary traffic control, ADA upgrades, drainage improvements,
<br />safety enhancements, and signing and pavement marking to meet performance goals on time and
<br />within budget. Uri combines rigorous QA/QC and materials oversight with advanced 3D OpenRoads
<br />modeling to optimize geometry, staging, and constructability. He is adept at coordinating utilities,
<br />permitting, and stakeholder communications while guiding multidisciplinary teams and mentoring
<br />staff. Known for rapid problem solving and clear documentation, Uri consistently reduces risk,
<br />improves corridor operations, and advances client objectives.
<br />FDOT D6, SR-9A/I-95 Segment 3 RFP Package, NW 29th Street to NW 79th Street, Miami, FL:
<br />Engineer-of-Record for all variations and exceptions related to the SR-9A/I-95 Segment 3 RFP
<br />Package, I-95 Pavement Reconstruction from NW 29th Street to NW 79th Street. Exceptions
<br />included: lane width, shoulder width, super elevation, cross slope, vertical clearance, and stopping
<br />sight distance. Design variations included: median width, border width, curb high speed facility, and
<br />stopping sight distance. (FPID #429300-2-52-01)
<br />FDOT D6, SR-9A/I-95 Segment 2 RFP Package, SW 8th Street to NW 29th Street, Miami, FL:
<br />Engineer-of-Record for all variations and exceptions related to the SR-9A/I-95 Segment 2 RFP
<br />Package, I-95 Pavement Reconstruction from SW 8th Street to NW 29th Street. Exceptions included:
<br />lane width, shoulder width, super elevation, cross slope, vertical clearance, and stopping sight
<br />distance. One exception required for the analysis included calculating the Benefit to Cost Ratio using
<br />the Predictive Method as outlined in The Highway Safety Manual. Design variations included: median
<br />width, border width, curb high speed facility, and stopping sight distance. (FPID #429300-1-52-01)
<br />FDOT D6, SR-9A/I-95 RRR Project Rigid Pavement Rehabilitation from Biscayne River Canal to
<br />Golden Glades Interchange (GGI), Miami, FL: Project Engineer responsible for all roadway plans
<br />production and development of innovative traffic control with temporary detours of closing ramps,
<br />and lane reduction on I-95 mainline NB and SB for the SR-9A/I-95 RRR Project Rigid Pavement
<br />Rehabilitation from Biscayne River Canal to Golden Glades Interchange (GGI). (FPID #429301-1-52-01)
<br />FDOT D6, Turnpike Ramp Connector 87270212 from SR-91/Florida Turnpike on Ramp, Miami-Dade
<br />County, FL: Project Engineer responsible for roadway design and signing and pavement markings.
<br />The scope of work included milling and resurfacing from MP 0.00 to MP 0.288 and MP 0.836 to
<br />MP 1.057, updating guardrail connections per FDOT design standards at the bridge approaches by
<br />removing and replacing guardrail. Improvements included incidental shoulder widening and a new
<br />shoulder gutter. (FPID #430821-4-52-01)
<br />FDOT D6, SR-817/NW 27th Avenue Improvements from NW 165th Street to NW 171st Street, Miami-
<br />Dade County, FL: Engineer-of-Record responsible for signing and pavement marking plans for this
<br />safety improvement roadway project. Responsibilities included managing, coordinating, and leading
<br />all efforts in design production for an urbanized roadway facility that incorporated widening and
<br />pedestrian sidewalk improvements for crossing at signalized intersections. (FPID #432743-5-52-01)
<br />YEARS EXPERIENCE
<br />23
<br />EDUCATION
<br />MS, Engineering Management,
<br />Florida International University,
<br />2016
<br />BS, Civil Engineering, Cleveland
<br />State University, OH, 2002
<br />REGISTRATIONS &
<br />CERTIFICATIONS
<br />Florida Professional Engineer
<br />#71141, 2010
<br />FDOT Maintenance of Traffic
<br />Advanced
<br />FDOT Specifications
<br />SOFTWARE & TECHNICAL
<br />SKILLS
<br />MicroStation/V8 XM Geopak and
<br />Auto Turn
<br />Open Roads 3D Design
<br />Bluebeam Revu. FDOT AFP
<br />Packages
<br />Vision Deltek (ERP) Software
<br />Guide Signs
<br />System Applications and Products
<br />(SAP)
<br />Interface with FDOT Project-suite
<br />Long Range Estimates (LRE)
<br />Preliminary Signalization and
<br />Electrical Estimate (PSEE)
<br />Microsoft Office Suite (MS Project,
<br />MS Professional, Share Point, Excel,
<br />Word, PowerPoint & Outlook)
<br />Adobe Acrobat Pro
<br />URI ASZODI, PE
<br />Professional Engineer
|