RFQ # 26-07-01 | CITY OF SUNNY ISLES BEACH 165
<br />CES CONSULTANTS, INC.
<br />Juan Rodriguez Ortiz is a dynamic and accomplished executive with significant experience in water
<br />and wastewater treatment and disposal, environmental compliance, solid waste management, air
<br />pollution management, and laboratory analysis. Throughout his 20-year career, he has successfully
<br />developed and directed strategic planning and regulatory compliance for process improvement
<br />activities and global regulatory design. His contributions have led to the improved development,
<br />implementation, and management of water and wastewater treatment programs. Juan has a
<br />proven track record in the project management of various stormwater and civil infrastructure
<br />engineering projects, roadway improvements, and sea-level rise infrastructure design. Juan is also
<br />an experienced Construction Manager, having worked on large-scale construction projects at a total
<br />of 133 Water Treatment Plants ranging from 0.2 to 130 MGD treatment capacity, many involving
<br />membrane filtration and lime softening systems, and 64 Wastewater Treatment Plants ranging
<br />from 0.3 and 90 MGD treatment capacity. As an experienced major/executive sewer authority
<br />owner and plant operator, the knowledge he brings to each project is invaluable. In his career he
<br />has successfully managed large-scale multi-phase capital improvement water and sewer treatment,
<br />water distribution and wastewater collection systems projects and programs from inception through
<br />completion, turn-over, and operation.
<br />MDWASD Ocean Outfall Legislation Program Management Services, Miami-Dade County, FL: Served
<br />as Owner’s Representative/Sr. Project Manager for the Miami-Dade Water and Sewer Department
<br />as part of the $3.3 billion Ocean Outfall Legislation Program Management team, an 11-year program
<br />with 28 capital projects that is the culmination of a 2008 regulatory mandate by the Florida
<br />Legislature to stop all wastewater discharge to the ocean by 2025. As a result of this mandate, WASD
<br />is implementing system-wide wastewater facility upgrades through the OOL program. Managed
<br />projects in complying with the requirements of the OOL in the most cost-effective and timely manner
<br />to stay within budget and to meet the regulatory deadlines imposed by the legislation.
<br />West Avenue North Neighborhood Utility and Resiliency Improvements, Miami Beach, FL: Civil/
<br />Stormwater Engineer. CES is the Lead Consultant/Designer and Engineer of Record for the design
<br />and construction of the water transmission/distribution system, sanitary sewer collection system, and
<br />stormwater drainage system for the West Avenue neighborhood in Miami Beach. The project includes
<br />the verification and development of a stormwater model, a new 120,000 GPM master stormwater
<br />pump station, and the design, vertical rehabilitation, harmonization, and ultimate construction of
<br />2.2 miles of roadway, sidewalks, landscaping, and related infrastructure, including water meter
<br />service conversions from the rear of private properties to new water lines and connections in the
<br />right-of-way. The project includes the design of a “Bay Walk” for pedestrians, which extends into
<br />Biscayne Bay at the west end of the Lincoln Road Corridor and proposed stormwater pump station.
<br />MDWASD Engineering, Design and Related Services for the Local Pump Station Improvement
<br />Program, Miami-Dade County, FL: Project Manager & Civil/Stormwater Engineer for the inspection/
<br />evaluation, analysis and design of multiple sanitary sewer lift stations ranging from 20 HP to 60 HP
<br />and associated force mains. The challenges found in designing these upgrades relate to two items.
<br />First, meeting the FEMA Base Flood Elevation for some of these small locations while maintaining
<br />operations and maintenance protocols is a challenge. Under this contract, we have converted several
<br />wet well / dry well systems into submersible stations. These conversions are requiring significant
<br />structural design to reuse the existing facilities. This effort is more cost effective than installing a
<br />new wet well.
<br />JUAN RODRIGUEZ ORTIZ
<br />Associate Vice President, Senior Construction Manager & Deputy Director of PM/CM;
<br />CEI Project Manager/Contract Manager
<br />YEARS EXPERIENCE
<br />20
<br />EDUCATION
<br />BS, Environmental Engineering,
<br />Polytechnic University of Puerto
<br />Rico, 2004
<br />AWARDS
<br />Distinguished Young Professional
<br />Award, American Water Works
<br />Association
<br />PROFESSIONAL AFFILIATIONS
<br />Chair/President, Board of Directors,
<br />Puerto Rico Water & Environment
<br />Association (PRW&EA), AWWA
<br />and WEF Puerto Rico Section,
<br />2007–2009
<br />Secretary, Board of Directors,
<br />Puerto Rico Water & Environment
<br />Association (PRW&EA), AWWA
<br />and WEF Puerto Rico Section,
<br />2006–2007
<br />AREAS OF EXPERTISE
<br />Wastewater Treatment Program
<br />Management
<br />Pumping/Distribution Operations
<br />Continuous Process Improvements
<br />Plant Maintenance Management
<br />Regulatory Compliance
<br />Network Management
|