Laserfiche WebLink
RFQ # 26-07-01 | CITY OF SUNNY ISLES BEACH 173 <br />CES CONSULTANTS, INC. <br />EDIER CHIONG <br />Senior Inspector <br />Edier Chiong brings over 19 years of experience delivering construction engineering and inspection <br />services on complex water, wastewater, and vertical infrastructure projects. His background includes <br />extensive work on large-scale treatment plant upgrades, pump stations, and utility systems, along <br />with structural inspection experience across South Florida. He has also served in field leadership <br />roles on active construction sites, providing a well-rounded understanding of contractor operations, <br />sequencing, and constructability. Edier provides reliable field presence, detailed inspection <br />practices, and proactive communication that supports compliance, schedule adherence, and quality <br />outcomes. He understands the importance of maintaining continuous operations within active utility <br />environments and consistently delivers thorough documentation and timely issue resolution. <br />Miami-Dade County Water and Sewer Department (MDWASD), Ocean Outfall Legislation Program <br />Management & Inspection Services, Miami-Dade County, FL: Senior Construction Inspector. The <br />Ocean Outfall Legislation Program is a $3.3B 11-year program with 28 capital projects, the culmination <br />of a 2008 regulatory mandate by the Florida Legislature to stop all wastewater discharge to the <br />ocean by 2025. As a result of this mandate, WASD is implementing system-wide wastewater facility <br />upgrades through the OOL program across the county. <br />Miscellaneous MDWASD Projects, Miami-Dade County, FL: Served as an Inspector overseeing <br />multiple projects, including: <br /> »3.01 Headworks and Sludge Degritting & Transfer <br /> »3.05 Secondary Clarifiers <br /> »3.05 (1) Secondary Clarifiers (Replace Mechanisms #1-10) <br /> »3.05 (2) Secondary Clarifiers (Remaining Scope of Work) <br /> »5.01 Upgrade of PS #0418 <br />Also served as an Assistant Project Manager overseeing multiple projects, including: <br /> »5.01 Upgrade of PS #0418 <br /> »CD 3.02 Primary Clarifiers and Odor Control <br /> »3.02 (1) Replace Mechanisms for Primary Clarifiers #4 & 6 <br /> »3.02 (2) Primary Clarifiers and Odor Control (Remaining Scope of Work) <br /> »3.06 Disinfection <br />Miscellaneous Construction Projects, Miami to Boca Raton, FL: Structural Engineering Inspector. <br />Experience included: <br /> »Augercast pile <br /> »Vibro replacement <br /> »Proctor compaction test <br /> »Concrete monitoring <br /> »Concrete sampling <br /> »Cylinder break <br /> »Terrazzo monitoring <br /> »Pull test <br /> »Density <br /> »Rebar inspection <br /> »Field determination of water penetration <br /> »Drilled shaft <br /> »Windows <br /> »Cable stressing <br /> »Grease cap <br /> »Roofing <br /> »PDA pile prep <br />YEARS EXPERIENCE <br />19 <br />EDUCATION <br />Building Construction Technology, <br />2000-2002 <br />Computer Programming, 1992-1994 <br />LICENSES/CERTIFICATIONS <br />General Contracting State License – <br />Active CGC1509993, 2005 <br />Operator License of Arial and Fork <br />Lift, 2007 <br />OSHA 30, 600329724, 2008 <br />Hilti Firestop, 0271063, 2009 <br />ACI Certify, 2014 <br />Nuclear Density Technician <br />COMPUTER SKILLS <br />AutoCAD, Revit Architectural, <br />3D max, Adobe Photoshop, Excel, <br />and Word