Laserfiche WebLink
RFQ # 26-07-01 | CITY OF SUNNY ISLES BEACH | CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA)64 <br />CES CONSULTANTS, INC. <br />developed and supported, including preparation of presentations <br />for City review and community engagement. Participation in <br />the 100 Resilient Cities Workshop resulted in direct design <br />enhancements. An arborist was utilized to identify and evaluate <br />the existing tree canopy within and adjacent to the right-of-way <br />to preserve existing green infrastructure where feasible. <br />Encroachment reviews and optional design considerations were <br />conducted to resolve conflicts, resulting in harmonization plans <br />for 137 properties. Each property plan set included a site plan, <br />landscape plan, and 3D perspective rendering. In addition, three <br />existing City and FDOT stormwater pump stations that interface <br />with the project were evaluated for emergency generator <br />locations and connections, supported by supplemental surveys <br />and site investigations to enhance system resiliency. <br />Utility coordination included collaboration with 18 utility <br />providers along the project right-of-way to identify existing <br />facilities, conflicts, and opportunities for relocations or <br />adjustments. A Master Utility Plan was created, developed, and <br />maintained to integrate and remediate affected utilities. Using <br />Civil 3D software, a detailed 3D utility model and interactive <br />video were developed to represent existing and proposed <br />subsurface conditions, minimize conflicts, and improve utility <br />corridor planning. <br />Stormwater Drainage System: Improvements include review and <br />evaluation of two existing hydraulic models and development <br />of an updated Stormwater and Hydraulic Model for the West <br />Avenue Project Basin, encompassing approximately 600 acres <br />extending east to the Atlantic Ocean. Modeling was performed <br />using ICPR4 and included upsizing of drainage lines, curb <br />inlets, and yard piping, along with significant upsizing and <br />modifications to proposed pump stations. Pre- and post- <br />construction scenarios and three alternative stormwater models <br />were developed, accounting for proposed roadway elevations <br />and existing finished floor elevations. A hydraulic grade line was <br />developed and maintained at one foot below the lowest finished <br />floor elevation. <br />The project includes replacement and upsizing of the stormwater <br />drainage system including 3,600 LF of 24-inch RCP drainage, <br />2,100 LF of 48-inch RCP drainage, 800 LF of 60-inch RCP <br />drainage, 2,300 LF of 72-inch RCP drainage, 400 LF of 84- <br />inch RCP drainage, and 300 LF of 96-inch RCP drainage, with <br />equivalent box culvert alternatives considered. Additionally, a <br />new 120,000 GPM stormwater pump station, including water <br />quality treatment units and a specialized dissipator discharge <br />structure, will be installed on the west end of Lincoln Road. <br />Water Distribution and Transmission System: Improvements <br />include replacement of existing water mains, including 1,150 <br />LF of 6-inch fire service lines, 7,350 LF of 12-inch distribution <br />main, and 3,000 LF of 20-inch transmission main. New service <br />connections, meters, hydrants, and irrigation lines will be <br />installed, and existing water mains will be decommissioned. The <br />new system will be installed along West Avenue, between 14th <br />Street and Lincoln Road, along Bay Road between Flamingo Way <br />and the Collins Canal, and along 14th Terrace to Lincoln Road <br />between West Avenue and Alton Road. <br />Sanitary Sewer Collection System: Improvements include <br />rehabilitation and/or replacement-in-kind of the existing <br />collection system along with adjustments to slopes and <br />manholes, with replacement of 5,400 LF of pipe ranging from <br />12-inch to 18-inch diameters and 32 manholes.