Laserfiche WebLink
PAGE 48 | RFQ 26-07-01; CITY OF SUNNY ISLES BEACH CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES <br />(CCNA) <br />TAB 3 - STAFFING <br />Jennifer Borges, PE, PTOE, MSEM <br />Traffic/Transit/Transportation Engineering Project Manager <br />Jennifer brings 16 years of experience in traffic engineering, with a strong focus <br />on traffic and safety studies. Her expertise includes conducting comprehensive <br />traffic analyses and pedestrian and bicycle studies to enhance roadway safety and <br />accessibility. She is also experienced in roadway design, signing and pavement <br />markings, signalization, and utility coordination. Jennifer has also managed <br />districtwide contracts and led efforts to integrate traffic and safety improvements <br />into Work Program projects through Scoping Committee Presentations. <br />Representative project experience includes: <br />Florida Department of Transportation - District 6, FL, Districtwide Traffic <br />Engineering Support Services Consultant. Project Manager for the development <br />of various traffic operations and safety studies for intersections, arterials, and <br />their associated improvements. Her current role as Project Manager includes <br />the preparation of Scope of Services, scheduling, invoices, and management of <br />subconsultants. Traffic studies completed under this contract include qualitative <br />assessments, signal warrant analyses, intersection and arterial analyses, left turn <br />phase warrant analyses, composite studies, data collection, road safety audits, <br />speed zone studies, and other related traffic engineering studies aimed at enhancing <br />road safety and efficiency. <br />Florida Department of Transportation - District 6, School Zone Evaluation for <br />Hialeah Gardens Senior High School. Project Manager for this school zone traffic <br />operations and safety evaluation project conducted following roadway widening, <br />reconstruction, and grade separation improvements along SR 25/Okeechobee Road <br />and Hialeah Gardens Boulevard, including assessment of a signalized crosswalk at the <br />school entrance. In her role as Project Manager, Jennifer is responsible for conducting <br />the school zone evaluation and leading traffic and pedestrian data collection and <br />analysis, including turning movement counts, vehicle gap measurements, pedestrian <br />group size counts, spot speed studies, near-miss observations, field reviews, <br />drone footage review, signal timing evaluation, Level of Service (LOS) analysis, and <br />overall school zone assessment. Her role also includes coordination with local law <br />enforcement and FDOT’s Community Safety Traffic Specialist to support outreach to <br />the school community, as well as identification of operational and safety needs such <br />as school zone designation, pedestrian signal timing modifications, enhanced signing, <br />and measures to improve student compliance with crossing procedures. <br />City of Miramar, Miramar Parkway at Miramar Park Regional Entrance and <br />Median Opening to the West Signal Warrant Analysis and Safety Evaluation. <br />Project manager for a traffic and safety study located along Miramar Parkway <br />at the Miramar Park Regional Entrance and the Median Opening to the West. <br />The City of Miramar requested a signal warrant analysis and safety evaluation in <br />anticipation of the increase in traffic demand due to upcoming developments, <br />including the expansion of an existing church, the expansion of an existing senior <br />housing development, and the construction of a private school. This study included <br />data collection, crash analysis for five years, collision diagrams, field reviews, trip <br />generation for new project development scenarios, and signal warrant analysis. This <br />study found a crash pattern for angle crashes at the median opening. Traffic counts <br />obtained were redistributed to the adjacent intersection. The recommendations <br />included installation of a directional median opening to address angle crashes with a <br />new traffic signal to address increase in traffic demand and redistributed traffic. <br />Education <br />Florida International University <br />(FIU), M.S. Engineering <br />Management (2011) <br />Florida International University <br />(FIU), B.S. Civil Engineering (2009) <br />Registrations <br />Professional Engineer: FL No. <br />78660 (01/05/2015) <br />Professional Traffic Operations <br />Engineer (PTOE) No. 4383 (2018) <br />Qualifications and <br />Certifications <br />CHA Project Manager Certification <br />ASCE Engineer of the Year (2020- <br />2021), Miami-Dade Branch <br />Memberships and Affiliations <br />ASCE Miami-Dade Branch