Laserfiche WebLink
PAGE 51 | RFQ 26-07-01; CITY OF SUNNY ISLES BEACH CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES <br />(CCNA) <br />TAB 3 - STAFFING <br />Ena Gonzalez, PE <br />Signing and Pavement Markings <br />Ena is a professional engineer with 21 years of experience in Transportation <br />Engineering. She has a solid background in the design/management phase services <br />related to transportation projects with experience in highway/roadway design, <br />horizontal/vertical alignment, storm water management, drainage, maintenance <br />of traffic, signing and pavement markings, signalization, construction estimates, <br />preparing Design Exceptions/Variations, Specs, and Pavement Design Selection <br />Reports. Representative project experience includes: <br />Miami-Dade County DTPW, FL, NE 16th Ave. Corridor, from NE 123rd St. <br />to NE 135th St. (0.76 miles).* Project manager and engineer of record for the <br />reconstruction of a 2-lane roadway, which includes a striped center turn lane, <br />sidewalks, curb & gutter, bike lanes, continuous storm drainage system, pavement <br />markings, and signage, signal modifications, landscaping, and coordination of street <br />lighting plans designed by another consultant. Ena’s responsibilities included the <br />design of the Roadway, SPM, and signalization. <br />Miami-Dade County DTPW, FL, SW 137th Ave., from US1 to SW 200th St. <br />(3.26 miles).* Engineer of record for the new construction of SW 137th Avenue, <br />which will initially be constructed as a four-lane divided facility between US1 and <br />SW 248th Street and a two-lane undivided facility between SW 248th Street and SW <br />200th Street. This project includes horizontal and vertical design, drainage, traffic <br />control, signing and pavement markings, lighting, environmental specifications, and <br />coordination with DERM and SFWMD. Ena’s responsibilities included the design of <br />the roadway, SPM, and lighting. <br />Florida Department of Transportation - District 6, FL, SR-826 / Palmetto <br />Expressway from US-1/SR 5/South Dixie Highway (MP 0.0) to SR 836/Dolphin <br />Expressway (MP 7.3)*. Project engineer for SR 826 improvements to implement <br />one express lane between US-1 and SR 874 and two express lanes in each direction <br />between SR 874 and SR 836. Roadway reconstruction along SR 826, 20 bridge <br />widening, 13 new bridges, and five bridge replacements are required to implement <br />PD&E Alternative 2B. In addition, the following express lanes access points are <br />included: northbound direct connect from transitway, northbound ingress from <br />US-1 / SW 88th Street, northbound direct connect from SR 874, northbound direct <br />connect to SR 836 eastbound, northbound egress to NW 25th Street / SR 826, <br />southbound ingress from NW 25th Street / SR 826, southbound ingress from SR <br />836 westbound, southbound direct connect to SR 874, southbound egress to SW <br />88th Street / US-1, southbound direct connect to transitway. Ena’s responsibilities <br />included roadway design of affected side streets, which included widening, milling, <br />and resurfacing of SW 88th Street, SW 72nd Street, SW 56th Street, SW 40th Street, <br />SW 24th Street, SW 8th Street, and Flagler Street. <br />Education <br />Florida International University, FL, <br />B.S., Civil Engineering (2004) <br />Registration <br />Professional Engineer: FL No. <br />72358 (01/29/2011) <br />Qualifications and <br />Certifications <br />Florida Advanced Work Zone <br />Traffic Control <br />*Prior to joining CHA