Laserfiche WebLink
PAGE 56 | RFQ 26-07-01; CITY OF SUNNY ISLES BEACH CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES <br />(CCNA) <br />TAB 3 - STAFFING <br />Ivonne Planas, PE <br />Water Distibution <br />Ivonne has over 28 years of experience designing water mains, sewer gravity and <br />force mains, paving and drainage systems, and permit procurement for residential <br />and commercial projects in South Florida. Ivonne is experienced in designing <br />different pipeline systems, including water and force mains, gravity sewers, pump <br />stations and stormwater systems using the applicable WASD, FDOT, Miami-Dade <br />County, Broward County, and other municipal standards. She has been the lead <br />design engineer for various projects, including hotels in the Caribbean, such as <br />Santa Lucia Hotel and Resort Pansea, and Parque Central Hotel. Ivonne is highly <br />proficient in MicroStation, AutoCAD, Microsoft Office Suite, and Internet Navigational <br />skills. Representative project experience includes: <br />Miami-Dade Water and Sewer Department, FL, 36-inch WM along NW <br />135th Street. Project engineer. This project involved the installation of a 36-inch <br />Transmission WM along NE/NW 135th Street from NW 7th Avenue to NE 16th Avenue <br />as part of MD WASD’s plan to upgrade its transmission piping network. It showcased <br />our team’s expertise in trenchless technologies, particularly in challenging right-of- <br />way situations. The project included designing and installing approximately 14,900 <br />linear feet of 36-inch WM, with 1,285 linear feet of 36-inch HDPE WM installed via <br />HDD under the Biscayne Canal. Additionally, the project required special MOT <br />coordination with FDOT, and meticulous permitting handled by CHA with SFWMD <br />and USACE, ensuring no delays. The team conducted thorough studies of existing <br />bridge conditions to design the HDD at a depth of 80 feet below grade, ensuring no <br />adverse effects on the bridge. <br />Miami-Dade Water and Sewer Department, FL, Emergency Replacement <br />of 48-inch FM crossing Oleta River. Project engineer. This project involved an <br />emergency installation of 800 LF of 48” FM under the Oleta River at NE 163rd Street <br />using the HDD method. After a leak was found in the existing FM, CHA designed a <br />bypass line via HDD to divert flows and allow repairs. The project included a traffic <br />management plan for NE163rd Street and required in-depth analysis of the NW163rd <br />Street bridge to confirm the HDD did not affect bridge piles. CHA completed the <br />design in two weeks demonstrating their ability to execute projects swiftly. <br />City of Fort Lauderdale. FL, 54-inch FM Redundant Emergency Replacement. <br />Project engineer. The project involved installing over 15,000 LF of 54-inch HDPE force <br />main, with a significant portion installed via HDD across six zones, navigating rivers, <br />canals, bridges, and other sensitive areas. The design required complex compound <br />and reverse curves to navigate right-of-way and environmental constraints and <br />accounted for thermal expansion and pressure differentials. The project also <br />involved securing permits from 11 jurisdiction agencies and completing certification <br />for over 30 permits, with all plans and permits approved in under six months due to <br />the emergency nature of the project. <br />Miami-Dade Water and Sewer Department, FL, Proposed 16-inch Water Main <br />Along NW 37th Avenue. Project manager responsible for furnishing and installing <br />approximately 16,000 linear feet of 16-inch and 12-inch ductile iron water main along <br />NW 37 Avenue (NW 36 Street to NW 82 Street). Responsibilities included plans, <br />specification preparation, and opinion of probable cost; permitting; and continuous <br />coordination with the owner, subconsultants, and regulatory agencies. This project <br />will guarantee the transfer of properties served by the City of Hialeah to the Miami- <br />Dade Water and Sewer Department. <br />Education <br />University of Havana, Cuba, B.S. in <br />Civil Engineering, Specialty Studies <br />in Hydraulics (1996) <br />Registration <br />Professional Engineer: FL No. <br />67358 (01/17/2008) <br />Qualifications and <br />Certifications <br />Florida Stormwater Erosion & <br />Sedimentation Control Inspector <br />Training Program <br />FDOT’s Maintenance of Traffic <br />Training Program