Laserfiche WebLink
PAGE 72 | RFQ 26-07-01; CITY OF SUNNY ISLES BEACH CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES <br />(CCNA) <br />TAB 3 - STAFFING <br />Jorge Abela <br />CEI Inspector <br />Jorge has over 34 years of experience in transportation/structural and related <br />projects, including airports, buildings and civil site work. Three years were <br />spent with the Florida Department of Transportation’s District 6 office. Jorge’s <br />transportation and structural engineering experience includes project management, <br />roadway inspections, site civil inspections, signing and pavement marking <br />inspections, public involvement and signal inspections. Representative project <br />experience includes: <br />Miami-Dade County Water and Sewer Department (WASD), FL, William <br />Lehman Causeway Forcemain Project, Miami, FL. PCTS 16078 [T2707]. CEI <br />senior inspector for this $4.4 million forcemain project assigned under the task <br />authorization contract for MDWASD. The project includes the installation of <br />approximately 6,060 LF of 24-inch, 20-inch, 16-inch, 12-inch, and 8-inch Sanitary <br />Force Main on William Lehman Causeway and Yacht Club Way from W Country Club <br />Dr. to Turnberry Way. Jorge is responsible for daily oversight of the construction <br />activities, manage the inspection staff to ensure the contractor adheres to MDWASD <br />safety standards, specifications and guidelines, review/process shop drawings, <br />RFI’s, and pay applications, run bi-weekly meetings as well as all necessary onsite <br />meetings, and conflict resolution meetings, and maintain well kept records of all <br />daily activities, MOT, SWPPP and weather reports. <br />Transportation and Public Works (DTPW), FL, SR 836 Express Bus Service and <br />Park-and-Ride Bus Terminal Tamiami Station, Tamiami, FL. Senior inspector <br />for providing construction engineering and inspection services for the construction <br />of the SR-836 Express Bus Service Tamiami Station Park and Ride/Bus Terminal <br />with Tamiami Station roadway improvements along SW 8th Street and SW 147th <br />Avenue. The site development included clearing and grubbing over 8 acres of <br />trees and vegetation on vacant land, sub-soil excavation and soil improvement of <br />approximately 36,000 cubic yards of native muck material, and over 64,000 cubic <br />yards of new embankment. It also included new structures such as a new driver’s <br />lounge, pedestrian walkway canopy, bicycle cage, bus canopy special structures, <br />and a 30-inch gateway sign and monument sign. <br />Miami-Dade County Department of Transportation and Public Works, FL, The <br />Underline, Phase II. QA/QC manager for this $2.14 million design-build project, a <br />part of a 10-mile linear park, urban trail, and living art destination that will transform <br />the land below Miami’s Metrorail. The Underline comprises a 10-mile multimodal <br />transportation corridor and world-class urban trail providing separate off-street <br />bicycle and pedestrian paths, landscaping, lighting, street furniture, and amenities <br />such as event gathering spaces, recreational fields, kiosks, gardens, etc. <br />City of Doral, FL, Canal Bank Stabilization and NW 109th Avenue New <br />Construction, Doral, FL. Senior inspector overseeing the construction of <br />improvements for the canal stabilization at NW 117th Avenue (NW 25th Street to NW <br />58th Street) and NW 25th Street (97th Avenue to 99th Avenue). The stabilization <br />involved implementing the “sloping” method and the “stacking” method, which <br />required excavation of canal slopes to ½:1 slope. Jorge was also in charge of the <br />extension of NW 109th Avenue (NW 41 Street to NW 50 Street), including installing <br />drainage, curb and gutter, sidewalk, and new roadway. <br />SF 330 <br />CEI senior inspector for this $4.4M forcemain project assigned under the task authorization contract <br />for M-D WASD. He oversees the installation of approximately 6,060 LF of various sizes of Sanitary Force <br />Main in Aventura, managing construction activities, ensuring contractor adherence to safety standards <br />and specifications, processing documentation, conducting bi-weekly and onsite meetings, and <br />coordinating a design change for system redundancy. <br />SF 330 <br />Senior inspector for providing construction engineering and inspection services for the construction <br />of the SR-836 Express Bus Service Tamiami Station Park and Ride/Bus Terminal with Tamiami Station <br />roadway improvements along SW 8th Street and SW 147th Avenue. The development involved clearing <br />over 8 acres, excavating and improving 36,000 cubic yards of soil, adding 64,000 cubic yards of <br />embankment, and constructing new facilities including a driver’s lounge, walkway canopy, bicycle cage, <br />bus canopy, and a 30-inch gateway sign and monument. <br />SF 330 <br />Senior inspector overseeing the construction of improvements for the canal stabilization at NW 117th <br />Avenue (NW 25th Street to NW 58th Street) and NW 25th Street (97th Avenue to 99th Avenue). The <br />stabilization involved implementing the “sloping” method and the “stacking” method, which required <br />excavation of canal slopes to ½:1 slope. Jorge was also in charge of the extension of NW 109th Avenue <br />(NW 41 Street to NW 50 Street), including installing drainage, curb and gutter, sidewalk, and new <br />roadway. <br />Education <br />Florida International University, FL, <br />Undergraduate Civil Engineering <br />Coursework - 3 years (1991) <br />Registration <br />TIN No. A14043263 <br />Qualifications and <br />Certifications <br />CTQP Certifications: <br />• Asphalt Paving Level 1 & 2 <br />• Final Estimate Level 1 & 2 <br />(Pending) <br />• Earthwork Level 1 & 2 (Pending) <br />Advance MOT <br />ACI Concrete Field Technician <br />*Prior to joining CHA