29Conemco Engineering, Inc. - RFQ # 26-07-01.; CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA)
<br />MARIELI P. FERREIRAS Project Designer
<br />
<br />
<br />
<br />DTD 190 – Polk St. (from N26 Ave to N24th) (Hollywood, FL)
<br />Mrs. Ferreiras prepared a set of civil drawings for the design of approximately 950 linear feet of gravity
<br />sewer line to connect the property to the City of Hollywood sewer system. This included 12 lateral
<br />gravity sewer connections, water connection details, paving and drainage, and pavement restoration.
<br />The design incorporated paving, grading, drainage with trench drain systems, marking and signage,
<br />and a stormwater pollution prevention plan.
<br />
<br />Saint Thomas University (Miami Gardens, FL)
<br />Mrs. Ferreiras prepared a complete set of structural plans and calculations for the fabrication and
<br />installation of a 50’ x 30’ LED scoreboard and signage for the football field. She also developed civil
<br />drawings and drainage calculations for Synthetic Turf Field #2 and the track. The civil drawings
<br />included designs for drainage, earthwork, and material specifications in accordance with the
<br />manufacturer’s recommendations. Additionally, Mrs. Ferreiras conducted a topographic survey of the
<br />football field and surrounding areas to properly locate the 60’ x 30’ LED scoreboard support and
<br />foundations, as well as the new track and field design. The survey included spot elevations for contour
<br />lines, the location of water meters, cleanouts, utility boxes, water valves, catch basins, sewer
<br />manholes with rim and invert elevations, pipe materials, edge of pavement, trees, swale areas,
<br />sidewalks, top of curb, building location, and irrigation system heads.
<br />
<br />Dolphin Linear Park – Walkway Lighting and Fitness Equipment EDP-PR-21030322001 (Miami
<br />Gardens, FL)
<br />Mrs. Ferreiras prepared a set of drawings and calculations for six fitness equipment stations, one
<br />cooling station, and six lighting pole base structures. The civil drawings included paving and drainage
<br />for the fitness equipment stations, water connection and distribution for the cooling station and hose
<br />bib, and all necessary utility coordination. Additionally, a preliminary cost estimate and specifications
<br />were provided to prepare the completed bid package.
<br />
<br />Blanche Ely High School Bus Loop Renovation (Pompano Beach, FL)
<br />Mrs. Ferreiras assisted with the preparation of a set of civil drawings for the re-grading, re-paving, and
<br />installation of a new drainage system for the reconstruction and expansion of the existing bus drop-off
<br />area. The scope also included the installation of a new aluminum walkway, construction of two
<br />additional walkways for the proposed bus drop-off, and structural plans for the new screen wall to
<br />enclose the existing cooling towers.
<br />
<br />Deerfield Beach Middle School (Deerfield Beach, FL)
<br />Mrs. Ferreiras played a key role in preparing civil plans for connecting Building 1's sprinkler system
<br />and roof drainage leaders to the existing stormwater collection pipes. She meticulously reviewed the
<br />available record drawings and existing specifications to ensure compliance with regulatory standards.
<br />Additionally, Mrs. Ferreiras conducted a special-purpose topographic survey, focused specifically on
<br />the client's designated boundary areas, to provide accurate civil details and underground utility plans.
<br />As an Assistant Civil Engineer, Mrs. Ferreiras demonstrated her technical expertise and attention to
<br />detail, delivering high-quality results for the project.
<br />
<br />Rojo Bros, LLC Building Office (Miami, FL)
<br />As the Lead Coordinator for a civil and construction project, Mrs. Ferreiras played a critical role in the
<br />development of stormwater drain improvements, new water and sewer connections, paving, and
<br />sloping. She coordinated survey efforts and collaborated closely with the surveying team to collect
<br />field data. Her team employed hybrid solutions, including pervious concrete and trench drains, to
<br />reduce runoff and enable groundwater recharge. In addition to her coordination efforts, Mrs. Ferreiras
<br />was instrumental in the Right of Way (R/W) mapping process, assisting with survey topo graphy,
<br />horizontal and vertical controls, and R/W design and easements. She also reviewed survey designs
<br />and R/W for several ingress and egress roadways.
|