Laserfiche WebLink
30Conemco Engineering, Inc. - RFQ # 26-07-01.; CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />EDUCATION <br />• Master of Science in <br />Engineering Management, <br />Florida International University, <br />Miami, FL, 2017 <br />• Bachelor of Science in Electrical <br />Engineering, Florida <br />International University, Miami, <br />FL, 2014 <br />• Bachelor of Science in <br />Computer Engineering, Florida <br />International University, Miami, <br />FL, 2014 <br />PROFESSIONAL REGISTRATION <br />• Professional Engineer Florida <br />P.E. # 97203 <br /> <br />CERTIFICATIONS <br />• Six Sigma Green Belt (CSSGB) <br />• OSHA 30-Hour <br />• Prosci Change Management <br />(POPM) <br /> <br />FIELD OF SPECIALIZATION <br />• Electrical Design <br />• Electrical PQ Testing <br />• Project Management <br />• Aigile System Product Owner <br /> <br />YEARS OF EXPERIENCE <br />10+ Years <br /> <br /> <br /> <br /> <br /> <br /> EXPERIENCE SUMMARY <br /> <br />With over a decade of experience in engineering, consulting, and <br />energy operations, Mr. Estevez has built expertise in project <br />management, systems integration, and technical analysis. His <br />background includes leading agile teams to implement enterprise -wide <br />digital platforms, performing advanced engineering calculations for <br />large-scale projects, and directing field operations across multiple <br />regions. He has supervised union workforces, overseen power quality <br />testing at various system levels, and delivered consulting services that <br />improve organizational efficiency and performance. Combining <br />leadership and technical acumen, he provides effective solutions that <br />enhance reliability, streamline processes, and support long-term growth <br />in both private and public sectors. <br /> <br />RELEVANT EXPERIENCE <br /> <br />WASD Pump Stations Upgrades (Miami, FL) <br />Mr. Estevez was direct point of contact for a WASD pump station <br />electrical upgrades of over 20 stations in Miami. The upgrade design <br />requirements spanned from specific voltage requests, phasing <br />upgrade, relocations among other. Each unique project presented <br />challenges from the governing municipalities, required coordination <br />with other utilities, and sometimes redundancy power for disruptions <br />and scheduled outages. <br /> <br />Alexander Orr Water Treatment (Miami, FL) <br />Mr. Estevez led a team that performed a transient analysis to the South <br />Florida plant by installing recorders to capture the transient occurrences <br />that were reported. The intricate findings, which lasted several weeks, <br />was resolved after several conversations led by Mr. Estevez, that traced <br />the faults coming from two feeders in the same bus at the utility <br />substation. <br /> <br />Miami Lakes Town Center (Miami Lakes, FL) <br />Mr. Estevez oversaw a multi-phase project in Main St, Miami Lakes, in <br />conjunction with The Graham Companies, that was divided into 4 <br />separate folios, spread over 1,000,000 Sq.Ft, and accounted for 8 total <br />buildings inclusive of retail, office, and residential buildings. The <br />timeline, strict ordinances, and construction environment created <br />complex project management conditions that were successfully <br />overcame with clear communication and prompt decision making. <br /> <br />Mt. Sinai Hospital (Miami Beach, FL) <br />Mr. Estevez led an imminent power quality investigation with a team of <br />specialized individuals, such as chief electricians, control center <br />dispatchers, dedicated switchmen, account manager, among others, to <br />quickly understand the cause of voltage sags that were occurring at the <br />hospital. Being such a delicate case, the investigation was done <br />overnight to minimize impact, and a resolution was swiftly implemented <br />to avoid any unprecedented equipment failure conditions. <br /> <br />Blue Lagoon Residences (Miami, FL) <br />Mr. Estevez was lead engineer in charge of designing and managing <br />full electrical implementation to project that included two 8-story <br />buildings, one 2-story club house, and two 3-story garage. This <br />multifamily project was over 400,000 Sq. Ft, has over 270 living units, <br />and required over 2000KVA. <br />ALEJANDRO ESTEVEZ, PE <br />Lead Electrical Engineer <br /> <br /> <br />Flagler Global Logistics Countyline (Hialeah, FL) <br />Mr. Estevez was in charge of all electrical infrastructure discussions to a corporate park that included <br />8 load-heavy commercial warehouses on Phase 1 of a multi-year plan. Discussions and coordination <br />were needed in order to add a substation in the area. Initial electrical load for Phase 1 surpassed <br />13,000KVA and 50,000KVA were projected within 10 years. The construction site, located north of <br />NW 154th St and east of NW 107th Ave, has a total area of over 20,000,000 Sq.Ft. <br /> <br />Aventura Mall Outage (Aventura, FL) <br />Mr. Estevez, during a tenure on the field operation side, responded to a high -profile outage directing <br />a team of union employees to respond and immediately repair equipment failure. SCADA logs and <br />record engineering drawings were carefully analyzed to understand the risk points and provide <br />redundancy recommendations for future instances. As the responding supervisor, Mr. Estevez for <br />quick response plan of action. All affected stakeholders were maintained updated, including media, <br />during the event. <br /> <br />Hard Rock Stadium Operations (Miami Gardens, FL) <br />Mr. Estevez was appointed operations point of contact between the engineering department at Hard <br />Rock Stadium and electrical utility. Over the course of 3 years with events such as NFL/ NCAA <br />televised games (including the 2020 Superbowl), Miami Tennis Open, and the highly anticipated debut <br />of F1 in 2022, Mr. Estevez assumed role to coordinate electrical certainty at all times. Constant <br />deliberations prior to these events with follow-up recommendations resulted in reliable electrical <br />service. With millions of dollars in revenue at stake electrical certainty is overshadowed but extremely <br />important. In 2013 there was a blackout in Mercedes-Benz Superdome, in New Orleans, during the <br />2013 Superbowl for 34 minutes that caused rippling effects to the industry. Prestigious televised events <br />have a large audience and Mr. Estevez and his team valued the responsibility given during his tenure <br />as direct point of contact. Communication, technical deliberation, and timely decisions are a pillars to <br />the role and were clearly demonstrated. <br /> <br />