32Conemco Engineering, Inc. - RFQ # 26-07-01.; CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA)
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />EDUCATION
<br />• Bachelor of Science in Civil
<br />Engineering, Florida
<br />International University, 2002
<br />
<br />CERTIFICATIONS
<br />• PTI Certification for Level 1
<br />Unbonded PT Installation,
<br />Post-Tensioning Institute,
<br />2023
<br />
<br />FIELD OF SPECIALIZATION
<br />• Statistical analysis
<br />• Environmental
<br />• Hazardous Waste Site
<br />Assessment
<br />• Pavement Design and
<br />Analysis
<br />• Transportation & Traffic
<br />Engineering
<br />• Geotechnical
<br />• Concrete
<br />Steel Design
<br />
<br />YEARS OF EXPERIENCE
<br />20 Years
<br />
<br />
<br />
<br />EXPERIENCE SUMMARY
<br />
<br />Mr. Herrera is a dynamic and team-oriented Civil Engineer and certified
<br />Engineer Intern (EI) with specialized expertise in Structural Inspections,
<br />Concrete and Steel Design, statistical analysis, environmental
<br />engineering, hazardous waste site assessment, pavement design and
<br />analysis, transportation and traffic engineering, and geotechnical
<br />engineering. Recognized for his results-driven approach, he is a
<br />dependable professional with a strong commitment to continuous
<br />learning and meaningful contributions. Mr. Herrera is a quick learner
<br />and diligent worker who thrives in collaborative environments. Bilingual
<br />in Spanish and English, he effectively facilitates communication and
<br />enhances team productivity.
<br />
<br />RELEVANT EXPERIENCE
<br />
<br />FLL Parking Garage (Fort Lauderdale, FL)
<br />Mr. Herrera was responsible for structural inspections on the Fort
<br />Lauderdale Hollywood International Airport Parking Garage Project,
<br />ensuring compliance with safety and design requirements.
<br />
<br />Hickman Garage (Miami, FL)
<br />Mr. Herrera inspected the repairs of cracked and spalled concrete at the
<br />bottom and edges of the concrete slabs, as well as on beams, columns,
<br />and walls. Additionally, he inspected the stucco repairs on columns,
<br />beams, slabs, and walls, and inspected all bollards on every floor.
<br />
<br />Banyan Tree Condominium – Phase 1 & Phase 2 (Miami, FL)
<br />Mr. Herrera completed the 40-Year Recertification for over 200
<br />townhomes at the Banyan Tree Townhouse Community. Additionally, he
<br />conducted inspections, while the contractor made repairs, to ensure
<br />that the work adhered to the design and met the Florida Building code.
<br />
<br />Pullman Hotel (Miami, FL)
<br />Mr. Herrera completed the 40-Year Recertification of the Pullman Miami
<br />Airport Hotel, which included comprehensive structural and electrical
<br />inspections. Throughout the repair phase, he conducted ongoing site
<br />inspections to ensure adherence to recertification standards and
<br />structural integrity requirements.
<br />
<br />Atlantic Technical College (Coconut Creek, FL)
<br />Mr. Herrera inspected the roof access ladders located on the exterior
<br />sides of multiple buildings to verify their condition and compliance with
<br />safety standards.
<br />
<br />Building and Special Inspections (Multiple Locations)
<br />Mr. Herrera conducted building inspections for projects such as One
<br />Ocean Condominium, San Regis Hotel, Harbor Shops Publix, Astor
<br />Condo at Delray Beach, and Brickell Financial Center. He performed
<br />field inspections of roof trusses, concrete pours, and steel
<br />reinforcement, as well as post-tensioned cable inspections and
<br />stressing (The Carbonell, Bella Mare Residences, The Jade Brickell
<br />Bay, The Residence at Bath Club). His work also included Excel-based
<br />stress logs, fireproofing inspections, floor flatness surveys, and
<br />monitoring pile driving and grouting activities.
<br />
<br />JAIME HERRERA, EI
<br />Inspector
<br />
<br />Fire Station No. 5 Hardening (West Palm Beach, FL)
<br />Mr. Herrea is performing structural inspections and providing construction-phase engineering support
<br />for the hardening improvements at Fire Station No. 5. Participating in the evaluation of existing roof,
<br />window, and exterior door conditions, verifying field conditions to support the Basis of Design Report
<br />(BODR), reviewing contractor submittals and shop drawings, conducting structural site inspections to
<br />monitor compliance with the approved plans and specifications, documenting field observations,
<br />identifying construction deficiencies, assisting with resolution of field issues, supporting substantial
<br />and final completion inspections, assisting with punch list development, and contributing to project
<br />close-out documentation.
<br />Fire Station No. 6 Hardening (West Palm Beach, FL)
<br />Mr. Herrara is performing structural inspections and providing construction-phase engineering support
<br />for the facility hardening improvements at Fire Station No. 6. Reviewing contractor submittals and shop
<br />drawings for conformance with the contract documents, conducting structural site inspections to verify
<br />the installation of the roof membrane, windows, and exterior doors, documenting field observations,
<br />identifying construction deficiencies, assisting with resolution of field issues, evaluating completed
<br />work for compliance with project requirements, supporting substantial and final completion
<br />inspections, assisting with punch list development, and contributing to project close -out
<br />documentation.
<br />Melrose Place (Ft. Lauderdale, FL)
<br />Mr. Herrera led the 40-Year Recertification process for Melrose Place, performing detailed structural
<br />and electrical evaluations. During the repair phase, he carried out continuous field inspections to
<br />confirm that all work met regulatory standards and upheld the building’s structural safety.
<br />
<br />Kenland Pointe Condominium Phase 2 (Miami, FL)
<br />Mr. Herrera conducted the 40-Year Recertification for Kenland Pointe Condominium Phase 2,
<br />overseeing both structural and electrical assessments. He provided continuous on -site inspections
<br />during the repair phase to ensure all work complied with applicable recertification standards and
<br />maintained the structural integrity of the building.
<br />
<br />Arya Hotel (Miami, FL)
<br />Mr. Herrera performed inspections of the post-tension cables and concrete restoration at the 7th-floor
<br />overhang, including observation of the final pool pump room slab placement. He also inspected a
<br />broken cable on the 4th floor and monitored cable stressing operations on the 6th floor. Additionally,
<br />he conducted evaluation procedures and ensured accurate documenta tion of all findings.
<br />
<br />Biscayne Senior Housing (Homestead, FL)
<br />Mr. Herrera was responsible for the visual inspection process of a two-story, 12,920-square-foot
<br />building with 31 units and prepared an assessment report of the structural and electrical components
<br />in accordance with Miami-Dade County recertification requirements. The evaluation included
<br />documentation of existing conditions, a building description, observed deficiencies, and
<br />recommendations supported by photographic records.
<br />
<br />HCA Florida JFK Hospital (Atlantis, FL)
<br />Mr. Herrera inspected the building exterior façades, evaluating structural conditions and identifying
<br />potential deficiencies. Prepared comprehensive structural assessment reports documenting findings,
<br />existing conditions, and professional recommendations. Reports included photographic evidence to
<br />support observations and ensure accurate condition analysis.
<br />
|