Laserfiche WebLink
33Conemco Engineering, Inc. - RFQ # 26-07-01.; CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />EDUCATION <br />• B.A. Civil Engineering; Instituto <br />Tecnológico de Santo Domingo <br />University (INTEC), 2006 <br /> <br />CERTIFICATION <br />• Project Scheduling: Estimate <br />Activity Durations; Coursera, <br />2022 <br />• Construction Project <br />Management; PACE University <br />Continuing Education, 2014 <br />• OSHA 10 hours in Construction; <br />Able Safety Consulting, 2013 <br />• Project Construction <br />Management; Match Talent, <br />2009 <br />• Microsoft Projects; Technologic; <br />2008 <br />• Supervision in Civil Engineer <br />Projects; Instituto Tecnológico <br />de Santo Domingo University <br />(INTEC), 2008 <br />• Budget for Roads; Instituto <br />Tecnológico de Santo Domingo <br />University (INTEC), 2007 <br /> <br />FIELD OF SPECIALIZATION <br />• Inspection Coordination <br />• Project Management <br />• Organizational Administration <br />• Compliance Assurance <br /> <br />YEARS OF EXPERIENCE <br />17 Years <br /> <br /> <br /> <br /> <br />EXPERIENCE SUMMARY <br /> <br />Ms. Selman is a results-driven and highly organized professional with <br />extensive experience in Construction Engineering and Inspection (CEI) <br />services. As a key member of the Conemco team, she brings a strong <br />background in project coordination, inspection administration, and <br />regulatory compliance. Ms. Selman is recognized for her meticulous <br />planning, dependable execution, and operational efficiency. Her <br />proactive mindset, innovative problem-solving abilities, and adaptability <br />under tight deadlines make her an asset on complex engineering <br />projects. She is also highly effective in team settings, demonstrating <br />exceptional communication skills and the ability to collaborate <br />seamlessly with multidisciplinary stakeholders. <br /> <br />RELEVANT EXPERIENCE <br /> <br />Hickman Garage Building (Miami, FL) <br />Ms. Selman coordinated and performed structural inspections of the <br />Hickman Garage Building, addressed deficiencies and provided <br />recommendations to proceed with proper repairs on all floors including <br />the roof. <br /> <br />Banyan Tree Condominiums Phase I and II (Miami, FL) <br />Ms. Selman worked on Structural Recertification inspections, reviewing <br />and preparing structural forms and reports in accordance with the <br />inspection procedural guidelines of the City of Miami building <br />department, including assessments of the roof system. <br /> <br />Ocean Bank - Electrical and Structural Certification (Miami, FL) <br />Ms. Selman prepared the 40-Year Structural and Electrical <br />Recertification reports for the two Ocean Bank buildings, in compliance <br />with the Miami-Dade County Recertification Section guidelines. During <br />the inspection process, any deficiencies identified were documented <br />and communicated to the Owner through a preliminary report outlining <br />items requiring correction prior to submission and approval of the <br />Recertification. <br />Arya Hotel (Miami, FL) <br />Ms. Selman coordinated the inspection of post-tension (PT) cables and <br />concrete restoration on the 7th-floor overhang slab. In her role as <br />supervisor, she oversaw the inspector conducting the inspections and <br />ensured that all reports were submitted to the client on schedule. Her <br />scope included the re-stressing of PT Cables #9 and #11, including a <br />pull test on Phase 2, Column 1, as well as a special inspection to <br />investigate the broken PT Cable #12. <br />Albion Hotel (Miami Beach, FL) <br />Ms. Selman provided special inspector services, including the <br />preparation of special inspector forms and the performance of required <br />inspections during the exterior sign installation process for the project, <br />in accordance with applicable codes and inspection requirements. <br />Eagle Trace Recreational Community Center Storage Building <br />(Coral Springs, FL) <br />Ms. Selman coordinated the inspection and evaluation of the Rake <br />Beams Reinforcement for the new building, confirmed it has been <br />installed, complies with the design requirements, and ensured reports <br />are delivered on time to the client. <br /> <br />PATRICIA SELMAN <br />Inspector <br /> <br /> <br /> <br />School Board of Broward County (SBBC) Broward County School Roof Asset Management <br />Services (Broward County, FL) <br />Ms. Selman is the Project Lead for Conemco supporting the development of a comprehensive Roof <br />Asset Management Program for the School Board of Broward County, Florida, aimed at optimizing the <br />life cycle of approximately 33 million square feet of roofing. Her responsibilities include managing the <br />Team that is conducting inspections, evaluations, and structural damage assessments, as well as <br />assisting with compliance reviews, construction restoration supervision, and fall protection design. <br /> <br />Broward County School Board-Schools Bleachers Visual Inspection (Broward County, FL) <br />Ms. Selman is part of the inspection team performing inspections of the bleachers at Broward County <br />Public Schools to ensure that the bleachers are free from hazards such as cracked welds, rusting, <br />loose fastenings, missing parts, missing or damaged wheels , row locks, concrete spalling, exposed <br />reinforcing steel, wood rot, chipped or splintered wood, evidence of wood destroying insects that would <br />deem the structure unsafe, and that the existing bleachers are structurally sound for the intended use. <br />Eagle Trace Recreational Community Center Storage Building (Coral Springs, FL) <br />Ms. Selman coordinated the inspection and evaluation of the Rake Beams Reinforcement for the new <br />building, confirmed it has been installed, complies with the design requirements, and ensured reports <br />are delivered on time to the client. <br /> <br />Sunset Apartments (Pompano Beach, FL) <br />Ms. Selman performed engineering inspections to monitor the repair process for the project, including <br />consultation and coordination with the Owner/Client, Project Manager, and General Contractor. Her <br />responsibilities also included the preparation of control logs and reports as required in accordance <br />with project and applicable code requirements. <br />Ocean Bank Palm Springs Branch (Hialeah, FL) <br />Ms. Selman prepared the 40-Year Structural and Electrical Recertification reports for the subject <br />property, in accordance with the Miami-Dade County Recertification Section guidelines. As part of the <br />inspection process, any deficiencies identified were formally docum ented and communicated to the <br />Owner through a preliminary report outlining all required corrective actions to be completed prior to <br />the submission and approval of the Recertification. <br />Beach Garden of Hallandale (Hallandale Beach, FL) <br />Ms. Selman conducted inspections and prepared the Structural and Electrical 40-Year Certification <br />report for the two-story residential building for 21 units, in accordance with Broward County guidelines. <br />Her scope included evaluation of structural and electrical components and the identification of any <br />deficiencies. All findings were compiled into formal documentation, and any required repairs were <br />communicated to the Owner prior to certification submission. <br />Birch Pointe Condominium (Fort Lauderdale, FL) <br />Ms. Selman performed structural safety inspection recertification services for the building, in <br />compliance with Broward County Administrative Provisions and BORA Policy 05-05. Her scope <br />included assessment of structural elements, identification of deficiencies, and documentation of <br />findings. Any items requiring correction were communicated to the Owner through a preliminary report <br />to ensure all issues were addressed prior to submission and approval of the final Safety Recertification <br />Reports.