Laserfiche WebLink
35Conemco Engineering, Inc. - RFQ # 26-07-01.; CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />EDUCATION <br />• Associate in Land Surveying; <br />Santo Domingo University, <br />1984 <br />• Technical in Constructions <br />Technician; Laboral School <br />Santo Domingo, 1979 <br /> <br /> <br />PROFESSIONAL AFFILIATION <br />• Dominican Colleges of <br />Engineers & Architects <br /> <br /> <br />CERTIFICATIONS <br />• Advanced AutoCAD <br /> <br /> <br />FIELD OF SPECIALIZATION <br /> Land Surveying <br /> Topographic Design <br /> Construction <br /> Data Collection <br /> Construction Management <br /> Civil 3D <br /> MDT <br /> AutoCAD <br /> Revit <br /> <br /> <br />YEARS OF EXPERIENCE <br />42 Years <br /> <br /> <br /> <br />EXPERIENCE SUMMARY <br /> <br />Mr. Soto brings more than 40 years of surveying experience, with a <br />wealth of knowledge in managing and coordinating large-scale <br />surveying projects, Right-of-Way (ROW) operations, and construction <br />activities. As an integral member of the project management team, he <br />has held roles as both Party Chief and Supervisor, where he was <br />responsible for leading and supervising the daily operations of field <br />surveying crews. <br /> <br />In his capacity as Party Chief and Supervisor, Mr. Soto manages day - <br />to-day field surveying tasks, reviews construction survey layouts and <br />topographic engineering designs, and ensures compliance with ROW <br />requirements. He is highly skilled in processing survey field data <br />collected through GPS, Digital Leveling, and Total Stations. Additionally, <br />he is proficient in generating survey drawings with AutoCAD and <br />Carlson Survey. His expertise includes establishing horizontal and <br />vertical controls, ROW delineation, project stakeouts, contours, profiles, <br />cross-sections, and performing earthwork calculations. <br /> <br />RELEVANT EXPERIENCE <br /> <br />Iskandar Building (Miami, FL) <br />Mr. Soto was responsible for conducting a topographic survey that <br />covered the Right-of-Way (ROW) layout and design revisions. The <br />survey included elevations at key locations along SW 7th Street, such <br />as the centerline, edge of pavement, center of swale, edge of sidewalk, <br />top of curb, and ROW line. Additionally, the survey extended 5 feet <br />inside the property on each side of the centerline. Cross-section <br />elevations were provided at a maximum grid interval of 10 feet. <br /> <br />Saint Thomas University (Miami, FL) <br />As Party Chief Project Manager, Mr. Soto oversaw the field construction <br />layout of horizontal and vertical field controls. He was responsible for <br />the field layout of the soccer field billboard projects and the calculation <br />of contour lines, cross-sections, and earth movement for the track and <br />field area. <br /> <br />Hamilton on the Bay (Miami, FL) <br />As Party Chief Project Manager, Mr. Soto performed the field layout for <br />both horizontal and vertical controls. He was also responsible for the <br />field layout of the project’s utilities, main entrance handicap ramp, <br />perimeter railing, and column building layout. <br /> <br />Maurice A, Ferre Park (Miami, FL) <br />As Party Chief Project Manager, Mr. Soto conducted a topographic <br />survey, including the legal description and property boundaries. He <br />performed a survey of the road Right-of-Way (ROW), collecting field <br />data to support project engineering and architectural d esign plans. His <br />responsibilities included locating all existing utilities, drainage, sewer <br />lines, manholes, water services, and asphalt roadways. Mr. Soto also <br />established baselines, centerlines, and benchmarks as references for <br />design and construction layout. Additionally, he performed drafting of <br />the collected field information and produced a CAD drawing for the <br />project. <br /> <br />LUIS SOTO <br />Party Chief <br /> <br /> <br />Somerset Country Club (Miramar, FL) <br />Mr. Soto managed the project scope, which included conducting topographic and Right -of-Way (ROW) <br />surveys with elevations. This work included spot elevations, cross-sections, centerline, edge of <br />pavement, center of swale, edge of sidewalk, top of curb (wher e applicable), right-of-way line, and 5 <br />feet inside the property line (typical on each side of the centerline). Cross -section elevations were <br />provided at a maximum of 40 feet, along with points of the profile required. <br /> <br />Best Choice Department Store Garage (Boca Raton, FL) <br />Mr. Soto was responsible for the field construction layout for both horizontal and vertical controls. This <br />included the layout of the project’s utilities, drainage, sewer services, water services, and building <br />layout. Additionally, Mr. Soto surveyed the Right-of-Way (ROW) and adjacent street tie-ins for garage <br />ingress and egress. The work also involved reviewing survey designs and ROW controls along the <br /> <br />FPL Jacaranda, Building AOB & CBO (Plantation, FL) <br />As Party Chief Project Manager, Mr. Soto conducted a topographic survey that included legal <br />descriptions and property boundary information. He collected field data to support the project’s <br />engineering and architectural design plans. This involved locating all existing utilities, drainage <br />systems, sewer lines and manholes, water services, and asphalt roadway features. Mr. Soto <br />established baselines, centerlines, and benchmarks as references for the design and construction <br />layout. He also drafted the collected field information and produced a CAD drawing. <br /> <br />Driftwood State Park -Basketball Metal Canopy (Hollywood, FL) <br />As Party Chief Project Manager, Mr. Soto conducted a topographic survey, collecting field data to <br />support project engineering and architectural design plans. He located all existing utilities, drainage, <br />sewer lines, manholes, water services, and asphalt roadways. He also identified trees and types, as <br />well as underground utilities. Mr. Soto established benchmarks for design and construction layout and <br />produced a CAD drawing of the field information collected. <br /> <br /> <br />HCA Palms West -Hospital (Loxahatchee, FL) <br />As Party Chief Project Manager, Mr. Soto oversaw a topographic survey that focused on spot <br />elevations of the parking lot and road Right-of-Way (ROW). He collected critical field data for the <br />project’s engineering and design plans, including the identificat ion and mapping of existing utilities, <br />drainage systems, sewer lines, water services, and trees. He also reviewed other landscape features <br />and underground utilities, establishing baselines, centerlines, and benchmarks as references for <br />construction layout. The survey data was documented in a CAD drawing. <br /> <br />Bus Shelter Pilot Projects (Sunrise, FL) <br />Mr. Soto led the topographic survey for the Bus Shelter Pilot Projects, gathering essential field data to <br />support the engineering and design of the shelters. This included locating utilities such as drainage <br />systems, sewer lines and manholes, water services, and asphalt roadways, as well as trees and other <br />landscape features. He also recorded spot elevations and established benchmarks to guide the design <br />and construction phases. The information was compiled into a CAD drawing for future use. <br /> <br />Saint Helen Catholic School (Lauderdale Lakes, FL) <br />As Party Chief Project Manager, Mr. Soto conducted a topographic survey, which included legal <br />descriptions and property boundary information. He collected field data to support the project’s <br />architectural and engineering plans, identifying existing utilities, drainage systems, sewer lines, <br />manholes, water services, and roadways. He also mapped trees and other landscape features, <br />establishing baselines, centerlines, and benchmarks for layout purposes. All field data was organized <br />into a CAD drawing.