Laserfiche WebLink
Tab 2 - Qualifications <br />• I-75 Alligator Alley Boat Ramp Design Survey and SUE: CTS established horizontal and vertical <br />control, recovered 16 primary control points, set 24 secondary control points, performed <br />terrestrial laser scanning, bathymetric surveying, topographic data collection, right-of-way <br />determination, and Quality Level B utility designation to support replacement of nine boat <br />ramps in environmentally sensitive areas. <br />• Fort Lauderdale–Hollywood International Airport Zulu RON Area: CTS performed high- <br />accuracy layout and certified as-built surveys within an active, security-controlled airfield. <br />The assignment included setting aircraft-envelope reference points, verifying constructed <br />conditions, and delivering AutoCAD files and electronically signed survey maps. CTS received an <br />overall client performance rating of 4.84 <br />• Water and Wastewater Utility Investigations: CCTS’s SUE personnel have supported the <br />Broward County Water and Wastewater Services Lead Service Line Inventory, Miami-Dade <br />County Land and Engineering Surveying Services, and Miami-Dade WASD Small-Diameter Water <br />and Wastewater Pipeline assignments. <br />CTS’s senior survey team brings substantial <br />professional depth. Lis Tolstoy, PSM, has 33 years of <br />experience in design surveys, right-of-way mapping, <br />control, GIS, LiDAR, bathymetry, and continuing- <br />services management. Pete Diaz, PSM, brings more <br />than 38 years of surveying and mapping experience, <br />including extensive FDOT District 6 and Miami-Dade <br />County work. His District 6 experience includes serving <br />as Project Surveyor for the drainage survey along SW <br />8th Street from SW 27th Avenue to Brickell Avenue, <br />where he coordinated field activities, recovered <br />and established horizontal and vertical control, and <br />obtained invert elevations for approximately 425 <br />drainage structures. He has also served in senior <br />survey roles for SR A1A from Alton Road to 26th Street <br />and the Overseas Highway from MM 26 to MM 27. His <br />broader Miami-Dade experience includes topographic, <br />right-of-way, control, drainage, sanitary, bathymetric, <br />and post-construction surveys for major WASD <br />transmission mains, wastewater outfalls, and City of <br />Miami Beach water-main projects. This experience <br />gives CTS direct familiarity with dense urban corridors, drainage and utility infrastructure, constrained <br />rights-of-way, coastal conditions, and FDOT District 6 survey requirements. Paul Doll, PSM, has more than <br />36 years of experience, including 30 years with FDOT District 4, and will provide independent professional <br />QA/QC. Dennis Stanton has 40 years of SUE experience, including more than 10,000 test holes and over <br />1,000,000 linear feet of utility designation using GPR, electromagnetic methods, vacuum excavation, <br />GIS, and 3D reporting.