My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CTS Engineering, Inc. Bid Document (17)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
CTS Engineering, Inc
>
CTS Engineering, Inc. Bid Document (17)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 12:51:32 PM
Creation date
8/31/2026 12:50:37 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tab 4 - Approach / Methodology <br />Pedestrian, Accessibility, and Public-Realm Integration <br />Pedestrian safety and accessibility will be incorporated into all applicable transportation assignments <br />rather than treated as a separate consideration. CTS will review consistency with the City’s ADA Transition <br />Plan and evaluate sidewalk continuity, width, surface condition, curb ramps, crossings, pedestrian signals, <br />obstructions, lighting, shade, transit access, and temporary accessible routes during construction. <br />Particular attention will be given to routes serving parks, schools, public parking, City facilities, transit <br />stops, commercial areas, beach access points, and the Town Center. Recommendations will consider <br />pedestrian comfort and the quality of the public realm in addition to minimum technical compliance. <br />Transit and Community Bus Support <br />The City provides free community bus service seven days per week through three operating lines and <br />offers real-time bus information to riders. Transit assignments may include: <br />• Route and stop-level performance analysis; <br />• Ridership and automatic passenger-count evaluation; <br />• GPS, travel-time, and on-time-performance analysis; <br />• Schedule and route optimization; <br />• Stop, shelter, bench, lighting, and ADA evaluations; <br />• Coordination with roadway construction and special events; <br />• First- and last-mile connectivity; <br />• Connections with Miami-Dade County and neighboring municipal services; <br />• Shuttle, circulator, and microtransit feasibility; and <br />• Documentation supporting surtax, grant, and performance-reporting requirements. <br />Recommendations will account for operational feasibility, driver and passenger safety, traffic delay, stop <br />accessibility, maintenance needs, and available funding.
The URL can be used to link to this page
Your browser does not support the video tag.