Tab 4 - Approach / Methodology <br />Implementation-Focused Recommendations <br />CTS will screen alternatives for safety, operations, accessibility, right-of-way, drainage, utilities, <br />constructability, cost, public acceptance, and funding eligibility. Where appropriate, recommendations <br />will be accompanied by concept plans, phased implementation options, preliminary quantities, cost <br />estimates, performance measures, and an implementation roadmap. <br />When an assignment advances into design, the assumptions and objectives established during the <br />study will be carried into roadway, signalization, ITS, lighting, signing and pavement marking, pedestrian, <br />bicycle, and maintenance-of-traffic plans. Maintaining continuity between study and design personnel <br />will reduce rework and help the City move efficiently from analysis to construction. <br />Schedule and Deadline Management <br />CTS will develop a task-based schedule for each work authorization identifying data needs, field activities, <br />technical analyses, City reviews, agency reviews, permitting, decision dates, and final commitments. <br />Typical phases will include: <br />Phase Representative Timeframe <br />Assignment definition and work planning 1–5 business days <br />Records review and existing-conditions investigation 1–4 weeks <br />Analysis, feasibility, and alternatives 2-8 weeks <br />Design development 6–20 weeks, depending on complexity <br />Permitting and bidding Agency- and procurement-dependent <br />Construction support and closeout Duration of construction <br />These durations will be refined for each assignment based on urgency, size, complexity, access, permitting, <br />public involvement, and City review requirements. <br />The Contract Manager will maintain a master schedule and workload register for all active City <br />assignments. Long-lead items—such as records acquisition, survey, SUE, utility coordination, equipment <br />selection, permitting, and stakeholder approvals—will be identified at the beginning of the task. <br />Compatible activities will proceed concurrently where practical, and staffing will be adjusted before <br />schedule concerns become delays. <br />Budget and Quality Control <br />Each work authorization will have a task-level budget aligned with the approved scope and schedule. <br />Labor and progress will be monitored against planned expenditures. Potential scope changes or <br />conditions affecting the authorized level of effort will be brought to the City’s Project Manager before <br />additional work proceeds. <br />QA/QC will occur throughout the assignment rather than only before final submittal. The process <br />will include discipline-level checks, interdisciplinary coordination, standards compliance, calculation