My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin, Giordano & Associates, Inc. Bid Document (32)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(26-07-01) Continuing Professional Architectural & Engineering Consulting Services (CCNA)
>
PROPOSALS
>
Calvin, Giordano & Associates, Inc
>
Calvin, Giordano & Associates, Inc. Bid Document (32)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2026 12:55:09 PM
Creation date
8/31/2026 12:52:57 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 33 <br />Client <br />Bal Harbour Village <br />655 96th Street <br />Bal Harbour, FL 33154 <br />Contact Information at Time of Project: <br />Mike Alvarez, CGC, PWLF <br />Utility Compliance Officer <br />Tel: 305.993.7361 <br />MAlvarez@balharbourfl.gov <br />Project Date <br />2018 - 2021 <br />Services Provided <br />Civil Engineering <br />Surveying <br />Construction Administration <br />Firm’s Fees <br />$ 384,755.00 <br />Construction Cost <br />$ 2,000,000.00 <br />CGA was retained by Bal Harbour Village to design and permit new water, sewer, and drainage <br />infrastructure within its gated residential community. Curb replacement and regrading were <br />also part of the scope. The purpose of the project was to replace infrastructure in disrepair, <br />improve surface ponding, replace damaged curbing and asphalt, and to relocate water mains <br />and meters to the front of properties for future maintenance access and monthly readings. <br />Coordination played a major role with the affected residences in terms of temporary water <br />shutdowns, maintenance of traffic, staging of equipment and materials, work on private <br />property, and restoration. <br />The project included over 3,000 LF of 4” and 10” water main inclusive of services, valves, <br />hydrants, and fire lines, 700 LF of sanitary sewer with manhole structures and laterals, 600 LF <br />of 15” drainage piping with new structures, 5,000 LF of curbing, and asphalt resurfacing. The <br />majority of water services were relocations from the back to the front of each property, requiring <br />horizontal directional drilling of new services within private property. Most water main was <br />installed by a combination of pipe bursting and horizontal direction drilling. <br />CGA’s role in the project included design, permitting, incorporating Geotechnical and <br />Subsurface Utility Exploration (SUE) findings, bidding support services, coordinating and <br />conducting a preconstruction meeting with all stakeholders, reviewing shop drawings, <br />addressing Contractor RFI’s, conducting full-time inspections, overseeing testing, reviewing <br />payment applications, managing the Contractor’s schedule, reviewing record drawings, closing <br />permits, and final project certification. <br />PHASE 3A INFRASTRUCTURE AND ROADWAY <br />IMPROVEMENTS <br />Bal Harbour, FL
The URL can be used to link to this page
Your browser does not support the video tag.