Laserfiche WebLink
<br />Craig A. Smith & Associates <br />Engineers ● Surveyors ● Subsurface Utility Engineering ● 3D Subsurface Imaging ● Utility Coordination <br />Utility Master Plan, Design and Construction Management for Town Wide 6 Phase Stormwater Improvement Plan <br />and Water Main Replacement - Town of Golden Beach, Miami-Dade County, Florida. Responsible for the master <br />planning, project management, resource allocation, scheduling, budgeting and quality assurance of the <br />stormwater and watermain and utility undergrounding design. Also responsible for the project management of <br />the stormwater and water main construction and implementation. <br />Stormwater Master Plan, Design and Construction Management for City Wide Priority Based Stormwater <br />Improvement Plan - City of Oakland Park, Broward County, Florida. Responsible for the master planning, project <br />management, resource allocation and quality assurance of the stormwater design, as well as the project <br />management of the stormwater construction and implementation. <br />Andrews Avenue Widening and Intersection Improvements - Broward County, Florida. Responsible for the roadway <br />widening and stormwater design improvements from Cypress Road to Racetrack Road, including intersection <br />improvements at McNab Road and Racetrack Road. Performed project management for construction observation <br />services. <br />Biscayne Boulevard Widening and Intersection Improvements - Miami-Dade County, Florida (FDOT District 6). <br />Responsible for the roadway widening and stormwater design improvements from NE 163rd Street to 203rd Street, <br />including intersection improvements. <br />NE 174th Street Roadway - Roadway Infrastructure Improvements – City of Sunny Isles Beach, Florida The <br />Roadway Improvements Project for NE 17 4th Street consisted of a reconstruction of both the drainage and the <br />road for approximately 0.2 miles from Collins Avenue to North Bay Road. The existing roadway system was failing <br />due to poor soil conditions, a limited drainage system and an undersized outfall. The new roadway incorporated <br />a reconstructed base with geotech fabric to offset the soils. The design also included a new drainage system that <br />met water quality requirements, site demolition, road regrading, utility relocations, sidewalks and paver walkways, <br />landscaping, curbing, bike paths and parallel parking. The design was completed within two years under budget <br />at a cost of $212,180. Construction of the project was completed in the Spring of 2017 with an estimated cost <br />of $3,682,392. <br />Sanitary Sewer Pump Station and Forcemain Improvements - Town of Pembroke Park, Pembroke Park, Florida. <br />Responsible for the master planning, project management, resource allocation, scheduling, budgeting and quality <br />assurance of the Sanitary Pump Station and Force Main Improvements Project for the Town of Pembroke Park. <br />Project was completely funded by a Rural Development Grant. Improvements included the installation of 1,500 <br />linear feet of 10-inch force main which remained a dry line for four years until further funding became available. <br />Remaining work included the rehabilitation of 22 lift stations, the decommissioning of 6 existing lift stations and <br />the installation of a magmeter with telemetry system. <br />Sanitary Sewer Improvements – Phase I – Bal Harbour Village, Bal Harbour, Florida. Responsible for the master <br />planning, project management, resource allocation, scheduling, budgeting and quality assurance of the <br />Wastewater Pump Station No. 3 and Gravity Sewer Improvements (Sanitary Sewer Improvements Phase I) project <br />for Bal Harbour Village which included the installation of a new triplex submersible pump station with a 12-foot <br />diameter wet well, control panel, automatic transfer switch receptacle, emergency generator, and all associated <br />appurtenances, in addition to approximately 1,350 linear feet of 18” gravity sewer lines to the pump station. <br />Town of Golden Beach – Water Distribution System Improvements, Golden Beach, Florida. Responsible for the <br />water distribution system improvements project for the Town of Golden Beach which was an integral part of the <br />town’s Capital Improvements Plan. Work included the installation of approximately 1,215 linear feet of 12-inch <br />water main, 13,850 linear feet of 8-inch water main and 1,050 linear feet of 6-inch water main, 37 fire hydrant <br />assemblies, and the transfer of 370 new water meters for a complete retrofit of the town’s water main <br />infrastructure. This project was funded through FDEP’s State Revolving Fund Program. <br />Sanitary Sewer Master Plan – Village of El Portal, Florida. Responsible for the master planning, project <br />management, resource allocation, scheduling, budgeting and quality assurance of the Sanitary Sewer Master Plan <br />which encompassed a comprehensive report to define priority areas and determined corrective actions required <br />to convert from a decentralized wastewater treatment system (septic system) to a new sanitary sewer gravity <br />collection system with lift stations. The Master Plan also included a comprehensive survey base map for the entire <br />village, hydraulic sewer modeling and the overall design of eighteen phases of construction. The sanitary sewer <br />systems were developed using best management practices, current levels of service, and to investigate various <br />funding sources. <br />36