<br />Craig A. Smith & Associates <br />Engineers ● Surveyors ● Subsurface Utility Engineering ● 3D Subsurface Imaging ● Utility Coordination <br />space and occupied with numerous utility conflicts. Obtained Provided construction management assistance to City <br />staff and project certification. The trunkline project allowed for connections to existing and future lateral drainage <br />connections of adjacent streets. FEMA FUNDED PROJECT. <br />Town of Golden Beach Capital Improvement Project Phase III & IV Stormwater Collection System - Miami-Dade <br />County, Florida. As part of a Town Capital Improvement Project, stormwater improvements for Phases III and IV <br />were designed and constructed to be consistent with the town’s overall master plan. The project consisted of a <br />stormwater master pumping station with submersible pumps, 14,500 linear feet of DIP drainage pipe and force <br />main (ranging in size from 16” to 72”), 205 drainage structures and 7 outfalls. FEMA FUNDED PROJECT. <br />NE 174th Street Roadway Roadway Infrastructure Improvements – City of sunny Isles Beach, Florida The <br />Roadway Improvements Project for NE 17 4th Street consisted of a reconstruction of both the drainage and the <br />road for approximately 0.2 miles from Collins Avenue to North Bay Road. The existing roadway system was failing <br />due to poor soil conditions, a limited drainage system and an undersized outfall. The new roadway incorporated a <br />reconstructed base with geotech fabric to offset the soils. The design also included a new drainage system that <br />met water quality requirements, site demolition, road regrading, utility relocations, sidewalks and paver walkways, <br />landscaping, curbing, bike paths and parallel parking. The design was completed within two years under budget <br />at a cost of $212,180. Construction of the project was completed in the Spring of 2017 with an estimated cost of <br />$3,682,392. <br />City of Oakland Park NE 6th Avenue Stormwater Trunkline – Broward County, Florida. As Engineer of Record, <br />performed hydrologic and hydraulic modeling, designed and permitted stormwater improvements within an area of <br />significant historical flooding concerns. The Trunkline consisted of ½ mile 7’ x 4’ Reinforced Concrete Box Culvert <br />within a City right-of-way of limited space and occupied with numerous utility conflicts. Obtained Provided <br />construction management assistance to City staff and project certification. The trunkline project allowed for <br />connections to existing and future lateral drainage connections of adjacent streets. FEMA FUNDED PROJECT. <br />Okeechobee County Southwest Drainage Improvements - Okeechobee County, Florida. As Engineer of Record, <br />designed and permitted stormwater improvements in accordance with the CAS-developed master plan within an <br />area of significant historical flooding concerns. Obtained FEMA HMGP funds for project. Provided construction <br />management services and project certification. <br />Ranch Lakes Estates Stormwater Improvements (Phases I, II, & III) - Moore Haven, Florida. Design and permitting of <br />stormwater improvements within an area of significant historical flooding concerns. Applied for and obtained grant <br />funding for project via FEMA-HMGP. Improvements included stormwater gravity collection system and 2 stormwater <br />pumping stations designed by other CAS staff. <br />City of Moore Haven - Avenue R Stormwater Improvements. As EOR, performed design and construction <br />management and was completed within budget and on time in May of 2018. This phase of stormwater <br />improvements involved the relocation of existing utilities and the installation of 1,200-LF of plastic swale liner (1/4 <br />section of 12-inch ID smooth inner wall perforated black P.E. pipe), 350-LF of PVC culverts, ten (10) concrete <br />headwalls, one (1) drainage structure, 4,000-SY of SOD and the regrading of 4,000-SY of swale. This project was <br />funded ($400,000) using State grants secured with the help of CAS and CAS Governmental Services <br />Spring Lake Improvement District - Stormwater Treatment Area. As Engineer of Record (EOR), filed and obtained a <br />conceptual permit for improvements from SFWMD, prepared a USDA funding application (FDEP 319 Grant) and <br />assisted in obtaining state legislative appropriation. Per the Master Plan, a 70-acre Stormwater Treatment Area <br />(STA) was designed and permitted. The STA consisted of two large wetland marshes divided by a stormwater pond <br />with upland tree preserve areas and an access maintenance road. The total project cost was $3.3M. The project <br />began in June 2015 and was completed in February 2017. <br /> <br /> <br />41