Laserfiche WebLink
<br />Craig A. Smith & Associates <br />Engineers ● Surveyors ● Subsurface Utility Engineering ● 3D Subsurface Imaging ● Utility Coordination <br />incorporated into the town over the last 70 years. The system, which comprises of an area nearly a mile square <br />has an array of shallow gravity sewer systems with over 40 lift stations which serve nearly that amount of Mobile <br />Home Parks, Industrial Parks, and Storage Facilities. The town has a couple legacy septic tank areas within the <br />service area which are targeted to be eliminated by the implementation of multiple septic to sewer projects. The <br />Master Plan consisted of evaluating existing town wastewater system infrastructure, develop proposed projects <br />to eliminate deficiencies, inefficiencies, and scope projects to address future growth and development. The <br />proposed plan would consist of constructing new lift stations, new sanitary sewers, and force mains to collect <br />and transfer sewage to the city of Hollywood treatment plant. The Master Plan evaluated the existing sewer <br />allocation in the Large User Agreement between the Town and the City of Hollywood to ensure the town has <br />compacity for forecasted growth indicated via census data and industrial growth projections. A fiscal schedule <br />developed to complete the work which includes the fallowing variables: town priority, project scale, scope, design, <br />cost and utility rates correlated with the current and future population and fiscal growth based on census data <br />shall be implemented. The plan was reviewed by the town and due to complexity of the town infrastructure and <br />ongoing development dynamic it is continually being updated. CAS is working with the town to scope and prepare <br />grant applications for the project in the master Plan to be implemented into the Capital Improvement Plan and <br />move project into design. <br />Hardee County Utilities Wastewater & Potable Water Improvements, Phase 8 – Hardee County, Florida. <br />The project consisted of the construction of a sanitary sewer & potable water system expansion, sewer & water <br />services, and other appurtenances. CAS provided preliminary engineering, engineering design services, <br />construction plans, project management, permits, bidding services, engineering services during construction and <br />construction observation services during the construction phase of the project and project close-out services. The <br />scope of work includes: The addition of approximately 6,200 feet of 8 inch diameter sanitary sewer mains, gravity <br />sewer and manholes; and 9,700 feet of 10-lnch, 8-lnch, and 6-lnch watermains, and the abandonment and <br />removal of existing septic tanks, conversion of all residences to the proposed sanitary sewer system via sewer <br />laterals, a complete road replacement within the limits of construction in the road, and the restoration of driveway <br />aprons and sod within the right-of-way. All water services were transferred from existing well to the Hardee County <br />Water System. <br />Hardee County Utilities Wauchula Hills Sanitary Sewer Improvements: Phase 7 – Hardee County, FL: Providing <br />project management for the engineering design and construction for the installation of approximately 3,915 <br />linear feet of 8-inch gravity sanitary sewer and associated manholes, a duplex wastewater lift station with a 6- <br />foot diameter by 16-foot deep wet well, 380 linear feet of 4-inch force main and 2,080 linear feet of 8-inch force <br />main extending along US Route-17. The project includes abandonment and removal of existing septic tanks and <br />connection of all residence to the new sanitary sewer collection system via sanitary sewer lateral installations. <br />Restoration will entail complete road replacement within the construction limits along with restoration of driveway <br />aprons and sod with right-of-way. <br />Ohio Department of Transportation District 5 – Roadway & Bridge Alignment, Lancaster, OH: Provided <br />construction management skills to assist contractors to meet planned design, standard, scope, schedule, and <br />budget. <br />City of Athens – Richland Avenue Corridor Lighting, Athens, OH: Conducted a topographic survey and created a <br />digital terrain model of Richland Ave Corridor Lighting and Sidewalk Rehabilitation Project. <br />Northern Perry County Sewer & Water - Rehoboth Sewer Feasibility Study, Rehoboth, OH: Prepared a Feasibility <br />Study to provide sanitary sewer for an unincorporated Village in the County. The study conducted compared cost <br />effectiveness of the following options: gravity sewer collection and a small package treatment plant, gravity sewer <br />collection and utilizing existing regional plant for treatment, forcemain system to a regional treatment plant, and <br />a decentralized treatment and collection system. <br />Northern Perry County Sewer & Water - Thorn-Port Thornville Lift Station Rehabilitation and Sanitary Sewer Force <br />Main, Thornville & Thornport (unincorporated), OH: Designed a force main and sanitary sewer lift station to be <br />rehabilitated for transferring sewage to a treatment facility over two miles from the decommissioned treatment <br />facility and nearly 100 feet higher in elevation while utilizing much of the same infrastructure. <br />Village of Pomeroy, Long Term Control Plan – Pomeroy, Ohio: Developed an Ohio EPA Long Term Control Plan to: <br />locate and identify Combined Sewer Outfalls (CSOs) into the Ohio River and tributaries, mapped all sewer <br />infrastructure in the city (sanitary, storm, and combined), and provided recommendations to eliminate CSOs and <br />Combined Sewers. <br />43