Laserfiche WebLink
<br />Craig A. Smith & Associates <br />Engineers ● Surveyors ● Subsurface Utility Engineering ● 3D Subsurface Imaging ● Utility Coordination <br /> <br />Subsurface utility engineering included 2D ground penetrating radar and utility soft digs, with special attention to <br />seawall tiebacks, drainage outfalls, and other subsurface components related to the bulkheads. Soundings were <br />collected up to 25 feet seaward of the bulkheads. The project began in October 2024 and was completed in <br />December 2024. Total project cost was $24,720. <br />595 Express Subsurface Utility Engineering and 3D Radar Tomography - Broward County, Florida. Mr. Keener <br />Served as Principal Surveyor for the 3-Dimensional Subsurface Utility Engineering (3D SUE) project completed for <br />the FDOT at the Interstate 595 reversible lanes project in Broward County, Florida. Mr. Keener oversaw the re- <br />establishment of horizontal and vertical control, the mapping of utility surface markings and utility excavation <br />holes, as well as Radar Tomography utilized in various areas along the entire route. Mr. Keener performed all <br />quality control and quality assurance for the project. <br />Golden Beach Drive & Collins Avenue – Town of Golden Beach, Florida. Mr. Keener Served as Principal Surveyor <br />for the route survey within the rights-of-ways of Golden Beach Drive, out to the three islands and along Collins <br />Avenue (SR A1A) for drainage improvements due to major flooding issues; total roadway reconstruction, <br />undergrounding of all utilities; water main replacement and miscellaneous surveys, as needed. Route spanned <br />approximately three miles. Surveying also included all city parks and a beach pavilion. <br />Seacoast Utility Authority: Northlake Boulevard/US-1 Water & Sewer Force Main Replacement – Town of Jupiter, <br />Florida. Mr. Keener Served as Principal Surveyor for Route survey along Northlake Boulevard and US-1 <br />(approximately 2.8 miles), including identification of right-of-way, property lines, above ground improvements, <br />utility easements, tree survey, cross sections, and subsurface utility engineering (utility locates). Mr. Keener <br />performed quality control and quality assurance for the project. <br />WWTP Triplex Lift Station Rehabilitation – City of Margate, Florida. Mr. Keener Served as Principal Surveyor for the <br />boundary, topographic survey and utility locates of existing buried utilities, including recovery of horizontal and <br />vertical control relative to project datum as previously established. <br />Golden Beach Drive & Collins Avenue – Town of Golden Beach, Florida. Mr. Keener Served as Principal Surveyor <br />for the route survey within the rights-of-ways of Golden Beach Drive, out to the three islands and along Collins <br />Avenue (SR A1A) for drainage improvements due to major flooding issues; total roadway reconstruction, <br />undergrounding of all utilities; water main replacement and miscellaneous surveys, as needed. Route spanned <br />approximately three miles. Surveying also included all city parks and a beach pavilion. <br />Central Island Drainage Improvements – City of Sunny Isles Beach, Florida. Mr. Keener served as Principal <br />Surveyor for the route survey including all above ground features within and extending ten feet beyond existing <br />rights-of-ways and off-site surveying for proposed stormwater pumping stations and associated outfalls. Scope of <br />work included 2D GPR utility locates within the project corridor for all streets between North Bay Road east to A- <br />1-A (Collins Avenue) and 174th Street North to 183rd Street. <br />Curry Hammock State Park - Monroe County, Florida. As subconsultant to Cummins Cederberg, Mr. Keener served <br />as Principal Surveyor for the route survey along the Overseas Highway (US Highway 1) in two areas for the design <br />of box culvert/bridge upgrades to improve water flow. The survey included the locations of all visible <br />improvements, above and below ground utilities, drainage structures as well as trees and landscaped areas to <br />the edge of heavy vegetation and subsurface utility engineering (utility locates). <br />Bahia Honda State Park – Monroe County, Florida. As subconsultant to Cummins Cederberg, Mr. Keener served <br />as Principal Surveyor for the Route survey along the entry road from the Overseas Highway (US Highway 1) to the <br />park employee lodging area for the design of drainage improvements due to frequent flooding. The Survey included <br />the locations of all visible improvements. <br />Town of Golden Beach Stormwater Improvements Phase III and IV – Golden Beach, Florida. Survey, utility locates, <br />design consistent with Stormwater Master Plan, permitting, cost estimating, construction management and <br />observation, survey for record drawings, testing, startup and certifications through project close-out for the <br />construction of a stormwater submersible master pump station, 14,500 linear feet of drainage pipe and pressure <br />main (16”-72” diameter), 205 drainage structures and 7 outfalls to provide drainage with Hydrodynamic <br />Separators (Downstream Defenders) for water quality treatment and a Tideflex Checkmate Valves for tidal <br />backflow prevention purposes. <br />49