Laserfiche WebLink
<br />Craig A. Smith & Associates <br />Engineers ● Surveyors ● Subsurface Utility Engineering ● 3D Subsurface Imaging ● Utility Coordination <br />City of Moore Haven Stormwater System Improvements, Moore Haven, Florida. Planning, survey, utility locates, <br />design, permitting bidding assistance and construction management and inspection services for The Ranch Lakes <br />Estates Improvements Project for the City of Moore Haven which consisted of the construction of a gravity <br />stormwater drainage system along with two master stormwater pump stations including force mains and canal <br />dredging. Construction included the installation of 7,103 linear feet of HDPE drainage pipe ranging in diameter <br />from 15-inch to 48-inch, 1,044 linear feet of force main, 76 drainage structures and two duplex stormwater pump <br />stations. <br />The Wave Modern Streetcar – Broward County, Florida. Mr. Keener served as Principal Surveyor for the project <br />which consisted of a proposed electric circulator streetcar system in downtown Fort Lauderdale to act as a local <br />transportation element for the redevelopment and revitalization of the south-eastern section of Broward County. <br />The track corridor was divided into two phases of 1.7 miles each. CAS was contracted to perform complete survey <br />and 3D radar tomography imaging for all existing subsurface utilities within the 3.4-mile future track corridor. CAS <br />performed over 500,000 square feet of 3D RT, GPR and EM locating. Utility location and modeling began in <br />February of 2014, and all phases of design were completed by December of 2014 for a total fee of $535,245. <br />Light Rail / Modern Streetcar Project – City of Miami Beach, Miami Dade County, Florida. Mr. Keener served as <br />Principal Survey for the project where CAS was hired as a subconsultant to Kimley-Horn & Associates, Inc. to <br />perform surveying, mapping and utility locating for a projected streetcar transit corridor for the City of Miami Beach. <br />CAS performed a complete right-of-way survey which included all existing above ground/below ground utilities, <br />trees, and landscaped areas for the two-phased project. The project included 4.5 miles of roadway on Alton Road, <br />Washington Avenue, 5th Street, South Pointe Drive, Meridian Avenue, Dade Boulevard and Convention Center <br />Drive. The survey and utility locates work for the project totaled $300,000. The project began in February 2016 <br />and was completed in December of 2016. <br />Pavilion Lake Boardwalk Improvements – City of Belle Glade, Florida. Mr. Keener served as Principal Surveyor for <br />the Map of Topographic Survey which included the location of the existing 700-foot +/- long wooden walkway along <br />Pavilion Lake. Cross sections were taken at 100-foot intervals transversely from the back of the camp sites to <br />approximate angle of repose in said lake. Utility locations within the camp sites were gathered and added to the <br />survey. Mr. Keener performed all quality control/quality assurance for the project. <br />Indian Trail Improvement District – Palm Beach County, Florida. Mr. Keener serves as Principal Surveyor for <br />miscellaneous projects performed for the Indian Trail Improvement District Engineering consultant. These projects <br />vary from writing legal descriptions for new units of development, ingress/egress and drainage easements and <br />utility easements, to providing record surveys for the ongoing district-wide culvert crossing replacement project. <br />All surveying for the district is relative to the Florida State Plane Coordinate Grid System horizontally and North <br />American Vertical Datum of 1988 (NAVD ’88) vertically, which is checked by Mr. Keener for quality control/quality <br />assurance. <br />Veteran’s Memorial Park Improvements – City of Margate, Florida. Mr. Keener served as Principal Surveyor for the <br />Map of Boundary and Topographic Survey for the engineering design of park improvements. This included an <br />overall survey of all existing features such as parking, curbing, above ground utilities, etc. The park includes two <br />boat ramps for access to the Pompano (C-14) canal. Mr. Keener performed all quality control/quality assurance <br />for the project. <br />Center Island Stormwater Pump Station – Town of Golden Beach, Florida. Mr. Keener served as Principal Surveyor <br />for the Map of Topographic Survey within the right of way of the strand lying west of Center Island Drive. The survey <br />included all above ground, visible improvements, and utility surface marks within the corridor. Structure data was <br />gathered such as rim, pipe type, size, materials, invert elevations, etc. Mr. Keener provided all quality <br />control/quality assurance for the project. <br />Spring Lake Improvement District Stormwater Treatment Area – City of Sebring, Florida. Mr. Keener served as <br />Principal Surveyor for the design of a 70-acre stormwater treatment area which consisted of two large wetland <br />marshes divided by a stormwater pond with upland tree preserve areas and an access maintenance road. More <br />specifically, a topographic survey included capturing all above-ground visible improvements and swales, berms, <br />etc. around the perimeter of the site. Elevations were gathered on an approximately 200-foot grid on-site. The on- <br />site lake was also located showing top of bank and edge of water, together with soundings taken in random <br />50