Laserfiche WebLink
Ben Abidian, PE; CGC <br /> CC2 CEI Senior Project Engineer <br /> Trainiee ID: 61057 <br />2 <br /> <br />CEI Project Engineer, 10/2022 thru12/2022 2022-1/2-210 Sheridan Bridge Over Turnpike Emergency Beam Removal and Replacement Hollywood. Contract Value: $2.9M. <br />Scope: Work consisted of two phases: Phase 1: Emergency operation to remove the severed structurally damaged beam barrier walls <br />and bridge deck, shutting down the east bound Sheridan Bridge overpass on Turnpike and setting up detours. Phase 2: Close <br />coordination and design assistance to the bridge designers, strategic coordination with UAOs, FAA, FDOT, Broward County public works <br />division, Cities of Hollywood, Pembroke Pines, Seminole tribe authority, law enforcement agencies, media, office of the Governor to work <br />3, eight-hour shifts in a span of 15 days to remove the second damaged beam, procure, furnish and install two pretensioned / precast <br />AASHTOO beams, by utilizing a 650 Ton Mobile Crane. Setting up Concrete formwork and reinforcement, for bridge deck and barrier <br />walls, pour ready-mix concrete, remove formwork, install pavement markings, site cleanup, and finally remove the detours and open the <br />east bound to traffic. Responsibilities included public relations involvement, preparing monthly and close out estimates and cost <br />projections for fund encumbrance, reviewing baseline and update CPM schedules. Detail pay item quantity tracking, document <br />management in Project Solve. Creating and maintaining As-built plans with Adobe, conducting pre-construction, pre-activity, and progress <br />meetings, and issuing minutes. NOI mitigation and utility coordination, MOT and Environmental Inspection and Coordination, Compliance <br />management, PO issuance, RFI and Shop drawing management, in-house and consultant CEI management. Ref.: HBMD Director - Anh <br />Ton, P.E., 954-931-7639. CEI Project Engineer, 7/2021 to 10/2022 FDOT D4: FM 43829415201: Homewood Blvd from Old Germantown Rd, Delray Beach. Contract Value: $2.5M. Scope: +2 miles <br />of existing roadway Milling and resurfacing the roadway with minor widening, Concrete sidewalk and driveway replacement, including <br />curb and gutter improvements. Signing and pavement marking upgrades, including bike lane and detectable warning surfaces, Installation <br />of four (4) signal mast arms at the Linton Boulevard intersection to meet current standards, Drainage and utility improvements. <br />Responsibilities included public relations involvement, preparing monthly and final estimates and cost projections for fund encumbrance, <br />reviewing baseline and update CPM schedules. Detail pay item quantity tracking, weather letters, CPPR letters, material comparisons in <br />MAC and document management in Project Solve. Creating and maintaining As-built plans with Bluebeam, conducting pre-construction, <br />pre-activity, and progress meetings, and issuing minutes. NOI mitigation and utility coordination, MOT and Environmental Inspection and <br />Coordination, Compliance management, WO, and SA issuance, RFI and Shop drawing management, in-house and consultant CEI <br />management. Ref.: FDOT Construction Engineer: Joe Marzi, P.E., (561)246-9059 CEI Project Engineer, 7/2021 to 10/2022 <br />FDOT D4: FM 43829515201: George Bush Blvd NE 2nd Ave to SR-AIA/Delray Beach. Contract Value: $2.1M. Scope: +3 miles of <br />existing roadway of milling and resurfacing the roadway with widening and slope correction, drainage and French drain installation, Concrete sidewalk <br />and driveway replacement, including curb and gutter improvements. Signing and pavement marking upgrades, including bike lane and <br />detectable warning surfaces, lighting infrastructure installation. Drainage and utility improvements. Responsibilities included public <br />relations involvement, preparing monthly and final estimates and cost projections for fund encumbrance, reviewing baseline and update <br />CPM schedules. Detail pay item quantity tracking, weather letters, CPPR letters, material comparisons in MAC and document <br />management in Project Solve. Creating and maintaining As-built plans with Bluebeam, conducting pre-construction, pre-activity, and <br />progress meetings, and issuing minutes. NOI mitigation and utility coordination, MOT and Environmental Inspection and Coordination, <br />Compliance management, WO, and SA issuance, RFI and Shop drawing management, in-house and consultant CEI management. Ref.: <br />FDOT Construction Engineer: Joe Marzi, P.E., (561)246-9059. <br />CEI Project Engineer, 1/2020 to 5/2020 FDOT D4: FM 43689315201: Bridge Modifications and Lighting Improvement Project on Congress Ave, Riviera Beach. Contract <br />Value: $3.4M. Scope: +4 miles of Installation of 96 new decorative light poles and their applicable infrastructures, Partial bridge deck <br />and railing replacement, Pavement marking and fencing installation. Responsibilities included public relations involvement, preparing <br />monthly and final estimates and cost projections for fund encumbrance, reviewing baseline and update CPM schedules. Detail pay item <br />quantity tracking, weather letters, CPPR letters, material comparisons in MAC and document management in Project Solve. Creating <br />and maintaining As-built plans with Bluebeam, conducting pre-construction, pre-activity, and progress meetings, and issuing minutes. <br />NOI mitigation and utility coordination, MOT and Environmental Inspection and Coordination, Compliance management, WO, and SA <br />issuance, RFI and Shop drawing management, in-house and consultant CEI Management. Project met all department goals, 10 days of <br />negative material certification. Ref.: FDOT Construction Engineer: Joe Marzi, P.E., (561)246-9059 <br /> <br />66