Laserfiche WebLink
Continuing Professional Architectural and Engineering Consulting Services (CCNA), RFQ 26-07-01 <br />Cummins Cederberg | Trusted by the Coast. Proven in Practice. <br />43 <br />JASON CUMMINS, PE <br />QA/QC Manager <br />Brickell Key Coastal Resiliency Study, Miami, Florida. An assessment of the existing shoreline and infrastructure was <br />conducted to understand the effects of sea level rise on normal and extreme conditions (hurricanes). This included <br />an inspection of coastal infrastructure to identify vulnerable areas along the entire shoreline perimeter. Analysis of <br />sea level rise and extreme tide events were performed to determine water level design conditions and assess the <br />potential for increased storm impacts. Recommendations for long term planning and mitigation options were provided. <br />Construction documents and environmental permitting was completed for the design, which focused on adapting <br />existing infrastructure to provide a cost-effective solution. <br />Indian Creek Village Country Club Vulnerability, Miami-Dade County, Florida. QA/QC to evaluate coastal resiliency <br />of the Club including potential sea level rise, vulnerability assessments and provided recommendations for potential <br />mitigation measures as part of the club’s planned upgrades to their property. Conceptual mitigation measures were <br />developed to address points of exposure and enhance the Club’s resiliency. <br />Hillsboro/Deerfield Beach Nourishment, Hillsboro Beach, Florida. Coastal engineering and environmental permit <br />processing for 400k cubic yard beach fill project. Engineering design of beach fill template. Cross-shore sediment <br />transport modeling. Geotechnical investigations and dredge plan for offshore borrow source. Prepared construction <br />drawings and technical specifications. <br />Las Olas Marina Redevelopment, Fort Lauderdale, Florida. Providing marine engineering and environmental <br />consulting services for the redevelopment of the marina. This project involves an expansion of the existing marina <br />through reclamation of previously filled tidal waters, renovating the marina layout to accommodate megayacht vessels, <br />and new dredging. Services performed are permitting, design, and construction administration. <br />Costa Brava Marina, Miami Beach, Florida. Environmental permitting for the reconstruction of a 30-slip marina <br />in Biscayne Bay through local, state, and federal agencies such as Miami-Dade County DERM, FDEP, and USACE. <br />Provided engineering support throughout construction bid process, including bid evaluation, contractor selection, and <br />construction administration. <br />Storm Surge Protection Wall & Wetland Restoration at Vizcaya Museum & Gardens, Miami, Florida. Site plan <br />for a storm surge protection wall, environmental wetland restoration, and public space. Included grant application, <br />regulatory permitting, and engineering design for marine works. The storm surge wall was designed with reinforced <br />concrete to withstand storm surge and high wave loads associated with tropical storm events. <br />Fincantieri Shipyard, Jacksonville, Florida. Providing marine engineering services for the shipyard redevelopment <br />project. Principal engineer for the design of nearly 2,000 LF of steel pipe pile bulkhead, mooring dolphins to <br />accommodate the +/- 500 ft long dry dock facility, dredging along the length of the bulkhead, as well as fendering and <br />mooring bollards. Overseeing both design and construction administration, which includes bulkhead replacement, <br />dredging, and mooring dolphins installation. The primary use of this facility will be for the maintenance of U.S. Navy <br />vessels. <br />Island Crowne Seawall & Boardwalk Repairs, Daytona Beach, Florida. Performed marine engineering services and <br />inspections of the existing 300 LF of storm-damaged seawall. The project included a visual assessment of the structural <br />components and identified any deterioration including cracks, displacement, corrosion, or voids. Services included <br />above water inspection, seawall and boardwalk design, environmental permitting, and construction administration. <br />Coronado Condominium Seawall & Dock Replacement, Highland Beach, Florida. Providing marine engineering and <br />environmental consulting services for a seawall and dock replacement. The project includes approximately 450 LF of <br />seawall and nine finger docks along the property waterfront. Services included above and below-water inspections, <br />seawall and dock replacement, construction administration, and environmental permitting. <br />Dinner Key Marina, City of Miami, Florida. QA/QC for the engineering design of repairs and replacement of sections <br />of the largest marina in the Southeastern United States. The $22M design-build included the replacement of pre-cast <br />beams, timber docks, timber mooring piles, new composite grating, and cross-bracing for timber elements.